Orange County NC Website
Michael Harvey <br />From: Grant Gale <br />Sent: Thursday, April 17, 2008 8:39 AM <br />To: Michael Harvey <br />Subject: 711 Terry Road <br />MEMORANDUM <br />TO: Michael Harvey, AICP, Zoning Enforcement Officer <br />FROM: J.Grant Gals, Solid Waste Enforcement Supervisor <br />DATE: April 17, 2008 <br />SUBJECT: PROJECT- 711 Teny Road Comments <br />39 <br />The Solid Waste Department Staff have reviewed the plans and have the following comments: <br />~GeneraC Comments: <br />Contact Solid Waste Staff: <br />Solid Waste staff strongly urges the applicant to contact Solid Waste staff to clarify recycling issues to streamline review <br />and revisions for solid waste needs. <br />Property is currently eligible for recycling service provided by Orange County Solid Waste. <br />Requested Stipulations or Conditions <br />Need Solid Waste Manas~ement Pian• <br />We recommend that a Solid Waste Management P}an be developed for this project. Specifically, this plan should address <br />how landclearing, demolition, and construction wastes will be disposed of and it recyclabies and waste generation rates <br />have been considered in planning for waste collection services. We recommend that this plan be initiated as soon as <br />poss~i(e so that the collection of recyclables can be considered as the site plan is being developed. We recommend the <br />applicant contact Solid Waste Staff at 918-2942 for assistance in developing the Solid Waste Management Plan. <br />Need Cardboard Recycling: <br />We recommend tha# prior to issuance of a Zoning Compliance Permit the applicant speclfically provide for corrugated <br />cardboard recycling, addressing compliance with RRMO cardboard recycling requirements. We believe that a second <br />durnpster to be utilized for recyclable cardboard may be necessary and should be incorporated into any Site Pian <br />changes. <br />Pre-construction Meetinr~ Stipuiation• <br />We recommend that the applicant be stipulated as a condition of permit issuance to hold the pre-demolition and pre- <br />construction conferences with Orange County Solid Waste staff. <br />Deconstruction Assessment Stipulation: <br />We recommend that the applicant be s#ipulated to hold a deconstruction assessment meeting with Orange County staff <br />(Roderick Jones 918-2942) concerning the buildings to be removed from this site. We also recommend the following note <br />be placed on the final plans: "Prior to any demolition or construction activity on the site the applicant will hold a <br />deconstruction assessment conference with the County's Solid Waste staff concerning buildings to be removed from this <br />site." <br />Refuse and Recycling Area Dimension Details: <br />The revised plans must include a sepaiate, tascale, dimensioned detail of any proposed refuse/recycling collection areas, <br />including pad length, width, and depth, associated screening, overhead clearances, and protective bolEards. Bollards <br />must be 6" C1D steel, with two bollards centered behind each bulk waste container and pieced 1' off the back wail of the <br />enclosure. Dempster, roil-cart, and compactor details should be provided to scale. Preferable scales for the detail are 1" <br />=10' or 1" = 20'. The revised plans label eadZ bulk waste container for type of material to be collected. ft is unclear from <br />the initial design how trash and recycling will be handled. Applicant appears to provide adequate roam for <br />recycling carts for paper and container recycling. Applicant must provide a 32.5' turn radius to allow vehicle to <br />enter site, access recycling carts, turn around and exit the site. Space for bulk refuse appears inadequate. <br />Dempster Ga es: <br />04/].7/2008 <br />