Browse
Search
Agenda - 09-02-2008 - 6d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 09-02-2008
>
Agenda - 09-02-2008 - 6d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2008 10:54:32 AM
Creation date
9/11/2008 10:24:41 AM
Metadata
Fields
Template:
BOCC
Date
9/2/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes - 20080902
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I'eloqui~~ ~o~ast~'tlC~o11, <br />www.peloquinconstruction.com <br />Orange County Planning Dept. <br />306F Revere rd. <br />Hillsborough, NC <br />c/o Glen Bowles Planner, & <br />Robert P Davis Supervisor <br />Re; Cabe Crossing, <br />Request to respond to neighbor concerns letter, dated July, 21, 08 <br />Dear Sirs, <br />I am sure you will appreciate our willingness to cooperate with answering any concerns which are <br />presented by the neighbors with regards to the construction and completion of Cabe Crossing, <br />which we have outlined below. <br />We have elected to address each area of concern corporately to avoid redundancies in <br />explanations and to the best of our ability to do so at his time. In some issues, which we have <br />determined are outside of our scope or actual legal or other viable authority, we endeavor to <br />explain the considerations of. <br />Specifically there are 4 areas of concern. <br />1. Management of construction traffic <br />2. Traffic management post-construction <br />3. Verification of set-backs, buffers and building envelopes <br />4.. Lighting in the subdivision, and other misc. requests to address <br />1. Request :That we limit storage of and movement of construction vehicles/equipment. <br />That we place signs on state road limiting same, and that a financial burden be placed <br />upon the developer to enforce any improvements to the entrance road should any damage <br />occur. <br />Finding : It was discovered that the major concern is that neighbors are worried that construction <br />vehicles may use their respective driveways for turn-around traffic, and possibly park on Cabe <br />Ford (a public road) and the neighboring private road overnight. <br />Response: While we would need approval to install signage from DOT for any placement of <br />signs on the Cabe Ford ROW, we are amenable to installing signage at the entrance to the new <br />Cabe Crossing development indicating that no construction vehicles should go beyond the entry <br />and no turn-around construction traffic is allowed at the end of cabe ford rd. In addition, we <br />would be willing to install a similar sign on the private Grady Lane (intersecting road) with <br />written permission to do so. These items will be contained in the Construction Management Plan <br />which is to be prepared upon acceptance by the Post Engineering who is in charge of the road <br />construction plans. <br /> <br />1020 Vista Wood Drive, Hillsborough, N.C. 27278 <br />e-mail Peloouin@mindsprinct.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.