Browse
Search
Agenda - 09-02-2008 - 6d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 09-02-2008
>
Agenda - 09-02-2008 - 6d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2008 10:54:32 AM
Creation date
9/11/2008 10:24:41 AM
Metadata
Fields
Template:
BOCC
Date
9/2/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes - 20080902
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COUNTY COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: September 2, 2008 <br />Action Agend~ a~ <br />Item No. <br />SUBJECT: Cabe Crossing (formerly Bramco Partners) Subdivision -Preliminary Plat <br />DEPARTMENT: Planning and Inspections PUBLIC (Y/N) N <br />HEARING: <br />ATTACHMENTS: <br />1) Resolution of Approval <br />2) Application <br />3) Vicinity Map <br />4) Agency Comments <br />5) Eno River Association Letter <br />6) Fiscal Impact Analysis <br />7) June 6, 2007 Planning Board Minutes <br />8) Neighborhood concerns and Applicant's Response <br />9) August 6, 2008 Planning Board Minutes <br />10) Preliminary Plat <br />INFORMATION. CONTACT: <br />Glenn Bowles, Planner II, 245 2577 <br />Robert P. Davis, Current Planning <br />Supervisor, 245 2580 <br />PURPOSE: To take action on the Cabe Crossing Subdivision Preliminary Plat. <br />BACKGROUND <br />The Concept Plan was approved on June 6, 2007. The Planning Board recommended <br />approval of the Concept Plan, with conditions, at its regular meeting on August 6, 2008. <br />Request -Preliminary Plan <br />Applicant: Jeff Peloquin of J. Peloquin Construction, Inc., agent for the owners. The <br />engineer for the applicant is Tim Smith of Phil Post & Associates of Chapel Hill, NC. <br />Owners: Bramco Partners <br />The subdivision follows the Conventional Design Option, but with all of the attributes of a <br />Conservation-Cluster Option of Flexible Development, except for the 100-foot perimeter <br />buffer. (The Preliminary Plat proposes a variable width perimeter buffer.) <br />• Total acreage is 73.47 acres <br />• Twenty (20) single family residential lots (Original Concept Plan approved for 33 lots) <br />• Lot sizes range from 1.56 acres to 3.33 acres, with a 2.22-acre average. <br />• The percentage of open space is 33.29% (24.46 acres). <br />• Gross density is 3.67 acres per lot. <br />
The URL can be used to link to this page
Your browser does not support the video tag.