Browse
Search
Agenda - 09-02-2008 - 4f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 09-02-2008
>
Agenda - 09-02-2008 - 4f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2008 10:05:35 AM
Creation date
9/11/2008 10:05:34 AM
Metadata
Fields
Template:
BOCC
Date
9/2/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4f
Document Relationships
Minutes - 20080902
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O <br />. _ Name: Eleanor Matthews Page 6 <br />Address: 4502 Mill Creek Rd. <br />City: Cedar Grove, N.C. 27231 <br />T' - - <br />Date: July ;~~, t.t)u2s <br />ELECTRICAL: <br />3. Install GFI protected receptacles in both bathrooms. <br />4: Install hard-wired smoke detectors in all sleeping rooms and <br />hallway. Install a total of four new smoke detectors. Make all <br />electrical connections. <br />Replace five (5} electric baseboard heaters that are not <br />working properly. Install new heaters of matching size. <br />Make all electrical connections per code. <br />INTERIOR: <br />KITCHEN: <br />1. Remove existing countertops in the kitchen. Install new countertops. <br />Owner to choose or approve color. (White, almond, butcher block etc) <br />Install all end caps as necessary. Note: Reinstall kitchen sink, supply- <br />line and drain line plumbing. <br />2. Install %a" lauan plywood and a new vinyl floor. The vinyl to cost <br />not less than $ 18.00 sq. yard. Install metal strips where vinyl meets <br />hardwood floors. Install finished shoe molding at all cabinet and wall <br />areas. Note: New vinyl to extend into laundry room area. Install <br />stained wood shoe molding. <br />3. Install new bi-fold wood laundry room doors. Doors to be complete <br />with new hardware and track. Install bi-fold 6-panel wood doors. <br />Stain the doors to match existing trim/cabinets as close as possible. <br />New doors to open and close properly. _ <br />HALLWAY BATHROOM: <br />1. Install a five piece accessory kit. The kit to include two, twenty-four <br />inch towel bars, paper holder, tumbler holder and soap dish. <br />
The URL can be used to link to this page
Your browser does not support the video tag.