Browse
Search
Agenda - 09-02-2008 - 4f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 09-02-2008
>
Agenda - 09-02-2008 - 4f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2008 10:05:35 AM
Creation date
9/11/2008 10:05:34 AM
Metadata
Fields
Template:
BOCC
Date
9/2/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4f
Document Relationships
Minutes - 20080902
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Name: Eleanor Matthews <br />Address: 4502 Mi11 Creek Rd. <br />City: Cedar Grove, N.C. 27231 <br />Date: July 24, 20U$ <br />YARD WORK & SEPTIC TANK: <br />Remove the under-growth and vines from the chain-link fence <br />located in the right side yard. Cut vines and ground level to expose <br />the fence from the corner of the house to the side property line. <br />Remove a section of the chain-link fence to provide access to the back <br />yard for equipment. Use abush-hog to cut under-growth to ground level. <br />Remove the cut under-growth from the ground and haul to a local landfill. <br />Note: Work will involve some hand raking to remove excessive piles of <br />debris. Trim all debris away from the unit. Note: Rehabilitation Specialist <br />to inspect yard before equipment is removed from site. Re-instaIl <br />the chain-link fence. <br />2. Pump the septic tank. Contact a licensed Septic Pumping Company <br />to perform this work. _ <br />InstaIl a new cover/lid on the septic tank. Note: New cover to fit <br />properly. Contact Environmental Health Dept. to inspect cover. <br />Note: If a riser is needed, the Owner, Conhactor. Rehabilitation Specialist <br />and Environmental Inspector will meet to review the work, determine <br />a course of action and cost for additional work. <br />4. Install new pressure treated handrails and decking boards on the <br />existing ramp and landing located on the right side. Install new 5/4" <br />decking boards. Properly nail or screw using galvanized fasteners. <br />Install new handrails. Note: The existing 4x4 posts to remain. Install <br />pressure treated 2x4 for the hand-grip section. Install horizontal members <br />of 2x4 and 1x6 to meet code. Install a decking board located at <br />the bottom between posts to prevent wheelchair wheels from falling <br />offramp. All nails and bolts to be hot dipped galvanized. <br />INSULATION: <br />Page 4 <br />1. Install R 19 insulation in the crawlspace. All work to pass code. <br />
The URL can be used to link to this page
Your browser does not support the video tag.