Browse
Search
Agenda - 09-02-2008 - 4f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 09-02-2008
>
Agenda - 09-02-2008 - 4f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2008 10:05:35 AM
Creation date
9/11/2008 10:05:34 AM
Metadata
Fields
Template:
BOCC
Date
9/2/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4f
Document Relationships
Minutes - 20080902
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Name: Eleanor Matthews <br />Address: 4502 Mill Creek Rd. <br />City: Ce a ~ '-`----~ ~i.C. 27231 <br />~, <br />Date: July 24, 2008 <br />EXTERIOR: <br />14. Pressure wash the exterior and prepare for paint. Pre-soak the exterior. <br />Spray a mildew cleaner on exterior. (% bleach & % mildew check) <br />Spray an exterior and let soak for 10 minutes. Clean with pressure <br />washer. Note: Do not damage siding & trim- Check spray tip before <br />work is to begin. Note: Rehabilitation Specialist to be on site during <br />this work. <br />Page 3 <br />15. Prepare the entire exterior for paint. Caulk all cracks and seams. <br />Remove shutters. Paint the siding with aflat-stain finish. Paint the trim, <br />boxing, shutters, windows and doors with semi-gloss latex paint. <br />All paint to cover completely Note: Color of siding and trim to match <br />existing unit. Re-install the shutters and window screens. <br />Note: All new trim installed to be primed before painting. <br />GUTTERS: <br />Install seamless aluminum gutters and downspouts on all fascias. <br />Install over-sized downspouts on the unit. Attach solid drain the <br />to alI downspouts to divert the water away from the unit. Install a <br />ten (10) ft section of drain the to all downspouts. <br />Note: Contractor to use proper drain file fittings to attach to <br />drain tile. <br />FOUNDATION: <br />1. Remove all debris and items from the crawlspace. Install 6-mil <br />poly in the crawlspace. <br />2. Fill and level the water line ditch from the side wall to the well. <br />Seed and straw the exposed area. <br />3. Remove existing foundation vents. Install new automatic foundation <br />vents. All vents to be secure in foundation. _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.