Browse
Search
Agenda - 09-02-2008 - 4f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 09-02-2008
>
Agenda - 09-02-2008 - 4f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2008 10:05:35 AM
Creation date
9/11/2008 10:05:34 AM
Metadata
Fields
Template:
BOCC
Date
9/2/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4f
Document Relationships
Minutes - 20080902
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Name: Eleanor Matthews <br />Address: 4502 Mill Creek Rd. <br />Pity: Cedar Cxrove, N.C. 27231 <br />1 "^1 <br />Date: July 24, X008 <br />EXTERIOR: <br />8. Install four (4) new floor joists below the dining room. Double the <br />existing joists. Note: Refer to Rehabilitation Specialist for replacement. <br />Nail the existing joists to the new floor joist. New floor joists to be <br />nailed through the new band. _ <br />9. Install a matching size back porch. A permit is required. Install 2x8 <br />floor joists and 2x10 band. All wood to be pressure treated lumber. <br />Porch floor to be tight against door sill. Install S/4" decking for <br />floor. Install flashing as necessary per code. Install steps per code. <br />( Refer to porch plan) histall 2x2 pickets and handrail around the <br />porch and steps. All work to pass Code. <br />10. Remove all decking boards from the front porch. Remove all <br />necessary lumber from the deck seats to remove the decking <br />boards. Install new S/4" decking boards on the front porch. <br />Note: All joints to be staggered at least 32". Nail the new <br />decking boards using a # 10 galvanized decking nail. <br />Re-install all lumber removed to replace decking. (12' x 24') <br />11. Remove the under-growth and existing lattice from the front porch. <br />Install new lattice in the following locations- end of porch, around <br />bottom section of front porch. Install all necessary trim to properly <br />attach new lattice. Instal12x4 against foundation to attach lattice. <br />Install pressure treated ground contact lumber along ground to <br />attach lattice. <br />Page 2 <br />12. Remove the existing handrails on the front porch steps. Install new <br />pressure treated handrails and 2x2 pickets to code. Note: New railings <br />to be secure. Install a 2x4 for the hand-grip section. Plane all rough <br />edges of the 2x4. Use nails and bolts shall be hot dipped galvanized. <br />13. Replace two damaged window sills. Refer to Rehabilitation Specialist <br />for location. Remove the window sill. Cut along where sill meets window <br />stool. Use a reciprocating saw to cut sill away from side jambs and <br />under brick-molding. Cut new sill to size. Prime and paint the new <br />sill before installing. Install all necessary shims and install using <br />Liquid nails. Caulk around window.stool, brick molding and under sill. <br />Apply a 2°a coat of semi-gloss latex paint. <br />
The URL can be used to link to this page
Your browser does not support the video tag.