Browse
Search
Agenda - 09-02-2008 - 4e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 09-02-2008
>
Agenda - 09-02-2008 - 4e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2016 3:14:42 PM
Creation date
9/11/2008 9:56:58 AM
Metadata
Fields
Template:
BOCC
Date
9/2/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4e
Document Relationships
Minutes - 20080902
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 . Total base price and adjustments, multiply by quality <br /> factor, and add design factor to achieve <br /> replacement <br /> cost. <br /> 5 . Repeat steps one through four for all exterior features <br /> and additions. <br /> 6. Total all replacement costs and factor by physical <br /> designs and then economic factors (economic factors can <br /> be plus or minus adjustments) to obtain current <br /> market value. <br /> The Residential and Farm Pricing Schedule is included in <br /> Appendix "A" of this manual and incorporated herein by <br /> reference. <br /> CONSTRUCTION QUALITY/MARKET FACTORS AND DESIGN FACTORS <br /> (This information should be considered as a guide with <br /> appraisal judgement being the final determining factors) <br /> USE OF QUALITY/MARKET FACTORS <br /> Judging quality would be a relatively simple process if all <br /> houses were built to conform to the base specifications <br /> outlined in this manual and with a hypothetical cost spread <br /> of 30% between classes. Since this ideal condition does not <br /> exist and it is not unusual for conventional houses to be <br /> built incorporating construction qualities that fall between <br /> these established classes, it is necessary to further refine <br /> the system. If the house that is being appraised does not <br /> fall exactly on a basic quality class but should be <br /> classified as slightly better or slightly poorer than the <br /> specific class, the use of the quality factor of 5% to 15% <br /> will accomplish this adjustment as to the base replacement <br /> cost of the house. <br /> As mentioned heretofore, these classes were computed with a <br /> 30% spread in replacement cost between classes. <br /> Consequently a plus 15% quality factor will give the same <br /> replacement cost as will a minus 15% quality factor of the <br /> adjacent higher class. As an illustration, the base price <br /> for a factor of 100+15% or "115" will be the same as for a <br /> factor of 130-15% or "115". <br />
The URL can be used to link to this page
Your browser does not support the video tag.