Orange County NC Website
C 100 <br /> D 70 <br /> E 40 <br /> Design Factor <br /> Indicate appropriate design factor if any. <br /> (Note) Entry must be a three digit entry with a decimal <br /> point following first digit. <br /> Example: A plus 5% factor must be shown as 0.05 <br /> Year Built <br /> Indicate year built for main and each segment not <br /> constructed the same year as the main. If construction <br /> dates are not available they should be estimated. <br /> Physical and Economical Depreciation (Economic (plus) <br /> adjustment) <br /> Indicate estimated loss of value from replacement cost new <br /> (expressed as a percentage) , or when used as a plus <br /> adjustment, indicates an estimated increase in value. <br /> Field 5 <br /> Replacement Cost <br /> Estimated replacement cost of primary structure and <br /> additions. Replacement costs are calculated and posted by <br /> the computer based on other information provided. <br /> Field 6 <br /> Value <br /> Total current value of primary structure and addition <br /> calculated and posted by computer. <br />