Browse
Search
Agenda - 09-02-2008 - 4e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 09-02-2008
>
Agenda - 09-02-2008 - 4e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2016 3:14:42 PM
Creation date
9/11/2008 9:56:58 AM
Metadata
Fields
Template:
BOCC
Date
9/2/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4e
Document Relationships
Minutes - 20080902
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The quality/market factor system and dwelling pricing <br /> schedules in this manualare keyed to average <br /> construction. The base factor, therefore, represents cost of <br /> construction with average quality of workmanship and <br /> materials involved and is designated as "100" with five <br /> basic classes established as follows: <br /> "160" Grade "A" - Excellent Quality <br /> "130" Grade "B" - Good Quality <br /> "100" Grade "C" - Average Quality <br /> "70" Grade "D" = Fair Quality <br /> "40" Grade "E" - Poor Quality <br /> In order to justify variation in costs/markets and to <br /> maintain uniformity, while retaining complete control <br /> throughout the range of these established classes, this <br /> schedule has been computed to indicate a spread of 30% <br /> between each class. The "130" class is based upon the <br /> use of better grade materials and higher quality workmanship, <br /> and with provisions for better individual features and <br /> interior finish, which reflects 30% higher cost than the <br /> "100" class. Likewise, excellent quality or "160" class <br /> construction reflects 30% more cost than the "130" class. <br /> Conversely, the "70" class for fair quality construction is <br /> computed 30% less than the "100" class. A dwelling of <br /> poor quality, constructed with low grade materials and <br /> inferior workmanship and lacking sufficient no/mal <br /> facilities is in another isolated class. This is the "40" <br /> class, 30% less than class "70". <br /> As a market factor, used in the market approach, these <br /> quality factors will be adjusted as indicated by market <br /> analysis (analysis of neighborhood and/or comparable sales) . <br /> When appraising new construction, the field appraiser will <br /> compare the new construction to existing quality/market <br /> factors in the immediate neighborhood to determine the factor <br /> that will be applied. Additionally, any valuation reviews <br /> will concentrate on market analysis and the indicated market <br /> factor level. Appraiser judgement based on market based <br /> information will be the basis for determining the correct <br /> quality/market factor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.