Browse
Search
Agenda - 08-25-2008- c2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 08-25-2008
>
Agenda - 08-25-2008- c2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 3:30:05 PM
Creation date
9/10/2008 3:29:50 PM
Metadata
Fields
Template:
BOCC
Date
8/25/2008
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
c2
Document Relationships
Minutes - 20080825
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />During October 2007-April 2008, a Planning Consultant, County staff and the following County <br />advisory boards have worked together to develop the draft Comprehensive Plan: Affordable <br />Housing Advisory Board, Agricultural Preservation Board, Commission for the Environment, <br />Economic Development Commission, Historic Preservation Commission, Orange Unified <br />Transportation Board, Planning Board, and Recreation and Parks Advisory Council. Input has <br />been provided by additional County advisory boards as well as the public. <br />The public hearing tonight will be the third that has been held during the Comprehensive Plan <br />update process. The last public hearing was held on May 19, 2008 to introduce and receive <br />public comments on the draft Comprehensive Plan in its entirety. The Board of County <br />Commissioners scheduled this additional public hearing tonight to provide more time for the <br />public to review the document and prepare comments. <br />General Contents <br />The Draft Comprehensive Plan includes the following Elements: <br />• County Profile (Data) <br />• Economic Development <br />• Housing <br />• Land Use <br />• Natural and Cultural Systems <br />• Parks and Recreation <br />• Services (Utilities) and Community <br />Facilities <br />• Transportation <br />Recommendations are also provided in the draft Comprehensive Plan that addresses the <br />administration, implementation, and monitoring of the Plan that will need to take place following <br />its adoption. <br />There are no major changes to existing/current policy directions incorporated into the draft Plan. <br />Furthermore, the draft plan does not include specific implementation recommendations; work <br />on those will start once this Plan with its framework of goals, objectives, and linkages is <br />adopted. This Plan update effort is designed to establish a common data base, to pull together <br />existing ideas and information that heretofore have been scattered among a series of topic- <br />specific plans and documents, and to set the stage for subsequent community discussions <br />about implementation strategies. <br />Public Input and Access to Materials <br />In addition to numerous citizen comprised County advisory board meetings, during Phase II of <br />the update process, the County conducted public input meetings on January 28tH, April 3~d, April <br />Stn and April 23~d. Several public input opportunities were also provided during Phase I. <br />All key documents that have been produced to date have been posted on the County's website. <br />Following is the address to the Comprehensive Plan Update Webpage and a partial listing of <br />documents that can be found there: http://www.co.orange.nc.us/planning/compre_cpupdate.asp <br />• Description of Process for updating the Plan and Timetable <br />• Brochure describing process and meetings <br />• BOCC Guiding Principles for the Plan <br />• County Profile (data) Element <br />• Public Input Meeting Summaries <br />• March 5, 2008 First Draft Comprehensive Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.