Orange County NC Website
`~3 <br />State of North Carolina <br />Department of Environment and Natural Resources <br />Reviev~ing Office: ~~• ~ . ~L ~~ <br />INTERGOVERNMENTAL REMEW -PROJECT COMMENTS Project Number: ~~~ ~~~ Due Date: <br />After review of this project it has been determined that the ENR permit(s) and/or approvals indicated may need to be obtained in order for this project to comply with North <br />Cazolina Law. Questions regarding these permits should be addressed to the Regional Office indicated on the reverse of the form. All applications, information and guidelines <br />relative to these plans and permits arc available from the same Regional Office. <br /> Normal Process Time <br /> <br /> PERMITS SPECIAL APPLICATION PROCEDURES or REQUIREMENTS (statutory time limit) <br /> ermit to construct & operate wastewater treatment Application 90 days before begin construction or award of construction 30 days <br /> facilities, sewer system extensions & sewer systems <br />contracts. On-site inspection. Post-application technical conference usual. <br />(90 days) <br /> not discharging into state surface waters. <br /> Application 180 days before begin activity. On-site inspection Pre-application <br /> NPDES - permit to discharge into surface water and/or conference usual. Additionally, obtain permit to construct wastewater 90-120 days <br />^ permit to operate and construct wastewater facilities treatment facility-granted after NPDES. Reply time, 30 days after receipt of (N/A) <br /> discharging into state surface waters. plans or issue of NPDES permit-whichever is later. <br />^ Water Use Permit Pre-application technical conference usually necessary 30 days <br />(N/A) <br /> Complete application must be received and permit issued prior to the 7 days <br />[] Well Construction Permit installation of a well. (15 days) <br /> ' Application copy must be served on each adjacent riparian property owner. <br /> On-site inspection. Pre-application conference usual. Fill'mg may require SS days <br />[] Dredge and Fill Permit Easement to Fill from N.C. Department of Administration and Federal (90 days) <br /> Dredge and Fill Permit <br /> Permit to construct & operate Air Pollution Abatement Application must be submitted and permit received prior to <br />construction and operation of the source. If a permit is required in an <br /> <br />^ <br />facilities and/or Emission Sources as per 15 A NCAC. <br />area without local caning, then there are additional requirements and 90 da s <br />y <br /> (2Q.0100 thru 2Q.0300) timelines (2Q.0113). <br /> <br /> <br />^ Permit to consWct & operate Transportation Facility as Application must be submitted at least 90 days prior to construction or <br />90 days <br /> per 1 S A NCAC (2D.0800, 2Q.0601) modification of the source. <br /> Any open buming associated with subject proposal <br /> must be in compliance with 1 S A NCAC 2D.1900 <br /> Demolition or renovations of structures containing <br /> asbestos material must be in compliance with 15 A 60 days <br />[_] NCAC 20.1 110 (a) (1) which requires notification and N/A (90 days) <br /> removal prior to demolition. Contact Asbestos Control <br /> roup 919-707-S9S0. <br />^ Complex Source Permit required under 15 A NCAC <br /> 2D.0800 <br /> The Sedimentation Pollution Control Act of 1973 must be properly addressed for any land disturbing activity. An erosion & <br /> imentation control plan will be required if one or more acres to be disturbed. Plan filed with proper Regional Office (Land Quality 20 days <br /> re or any part of an acre. An express review option is <br />Section) At least 30 days before beginnin activity. A fee of$65 for the fir <br />st^-ac <br />~ (30 days) <br />~ <br /> // <br />~~ <br />available with additional fees. <br />C ~ a- ~._-rJ ~!-+1ti ~O ~ ~ ~-- S <br />C] Sedimentation and erosion control must be addressed in accordance with NCDOT's approved program. Particular attention should be given to (30 days) <br /> design and installation of appropriate perimeter sediment trapping devices as well as stable stormwater conveyances and outlets. ~ <br /> On-site inspection usual. Surety bond filed with ENR Bond amount varies <br /> <br />] <br />Mining Perini[ with type mine and number of acres of affected land. Any arc mined greater 30 days <br /> than one acre must be permitted. The appropriate bond must be received (60 days) <br /> before the permit can be issued. <br />^ North Carolina Buming permit On-site inspection by N.C. Division Forest Resources if permit exceeds 4 days 1 day <br /> (N/A) <br /> <br /> <br />n <br />Special Ground Clearance Buming Permit - 22 On-site inspection by N.C. Division Forest Resources required "if more than <br /> <br />five acres of ground clearing activities are involved. Inspections should be <br />1 day <br /> counties in coastal N.C. with organic soils <br />requested at least ten days before actual bum is planned." (N/A) <br />^ IOiI Refining Facilities I N/A I 90-120 days <br />(N/A) <br />If permit required, application 60 days before begin construction. Applicant <br />must hire N.C. qualified engineer to: prepare plans, inspect construction. <br />certify construction is according to ENR approved plans. May also require <br />^ Dam Safety Pertnit permit under mosquito control program. And a 404 permit from Corps of 30 days <br />Engineers. An inspection of site is necessary to verify Hazard Classification. A (60 days) <br />minimum fee of $200.00 must accompany the application. An additional <br />nrntesainc fee haaetl nn a nernentaoe. nr the total nrnir,M Gnat will he rennired <br />