Browse
Search
Agenda - 08-25-2008 - c1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 08-25-2008
>
Agenda - 08-25-2008 - c1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 2:41:14 PM
Creation date
9/10/2008 2:41:01 PM
Metadata
Fields
Template:
BOCC
Date
8/25/2008
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
c1
Document Relationships
Minutes - 20080825
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~d <br />Issues/Questions/Comments at the NIM: <br />1) Will Orange Alamance water be provided to the subdivision? <br />2) How will the water lines be brought to the site? <br />3) What will be the impact of the water line and subdivision on existing residents <br />and homes? <br />4) Will fire hydrants be placed along the new line outside of the subdivision? <br />5) Why haven't the fire hydrants at Efland School been relocated before now if they <br />were unsafe and non-functional? <br />6) Will the street have curbs within the subdivision? <br />7) Will there be sidewalks provided? <br />8) Why can't this project be like Ashwick? <br />9) No green space behind lots 5, 6, and 7. Because lots are small and the McAdoo <br />property to the rear (south) is undeveloped the tendency to encroach will be <br />likely. <br />10) Will Tinnin Road be widened and improved to handle construction, existing and <br />anticipated traffic? <br />11) Will School House Road be widened and improved to handle construction, <br />existing and anticipated traffic? <br />12) Will additional right-of--way be needed along both Tinnin Road and School House <br />Road? There was a question of there being a 60-foot right-of--way on both roads; <br />the residents believe 50 feet is the width. <br />13) The speed limit on Tinnin Road is too high. <br />14) Will water pressure on School House Road and Tinnin Road be improved? <br />15) Lots 44 and 45 seem too small and irregular. <br />16) Will Public Service Natural Gas be extended to this subdivision? <br />17) This neighborhood is a multigenerational neighborhood and family has lived here <br />many decades. This project will create big impacts on our neighborhood. <br />18) How will driveway and water lines be impacted when Tinnin Road is extended? <br />Will there be any inconvenience or loss of service for extended periods of time? <br />19) Is this subdivision meant to be a place for UNC-Chapel Hill employees? <br />20) Will the subdivision have any recreation area? <br />21) A resident asked "if this project gets rezoned could I get mine rezoned too or is <br />this just a one time deal for this developer'? <br />Mr. Davis informed meeting participants that this petition is scheduled for a public <br />hearing on August 25, 2008 at 7:30 PM in Hillsborough and that all persons will be <br />allowed to speak in favor, in opposition or to make general comments about the proposal. <br />Meeting adjourned at 9:00 PM. <br />
The URL can be used to link to this page
Your browser does not support the video tag.