Browse
Search
Agenda - 08-25-2008 - c1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 08-25-2008
>
Agenda - 08-25-2008 - c1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 2:41:14 PM
Creation date
9/10/2008 2:41:01 PM
Metadata
Fields
Template:
BOCC
Date
8/25/2008
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
c1
Document Relationships
Minutes - 20080825
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />ARTICLE 8.8.29 -MAJOR SUBDIVISION CLASS A SPECIAL USE (RURAL DESIGNATED OR URBAN DESIGNATED) <br />SPECIFIC STANDARDS (continued) <br />("Yes" indicates comaliance; "No" indicates non-compliance) <br /> PLANNING STAFF PLANNING BOARD <br /> RECOMMENDED EVIDENCE SUBMITTED RECOMMENDED <br /> FINDINGS TO SUPPORT FINDINGS FINDINGS <br />Ordinance Requirements <br />2. Subdivisions that include x Yes No Yes No <br />retention/detention ponds Equivalent devices in <br />shall comply with the accordance with NC DENR <br />requirements in Section stormwater manual will be <br />6.23.4, Operation and used. <br />Maintenance of Structural <br />Best Management <br />Practices. <br />g. Grading and Erosion Control <br />1. Plans for grading and x Yes No Yes No <br />erosion control comply Will comply with all Erosion <br />with standards contained in Control rules and regulations <br />the Orange County Erosion as well as State Neuse River <br />and Sediment Control rules. <br />Ordinance and Manual; <br />2. Construction is phased x Yes No Yes No <br />to the extent practical to Construction follows a three <br />minimize disturbance and phase approach. <br />sedimentation; <br />3. Sediment control x Yes No Yes No <br />measures will be properly Detention basins to handle <br />installed to filter sediment silt and turbidity will be <br />from runoff during install prior to an grading. <br />construction and Conversion of the devices <br />maintained until grading is will occur as stabilization <br />complete and a permanent occurs in the sub basins. <br />vegetative cover has been <br />established and all slopes <br />stabilized; and <br />4. Permanent landscaping, x Yes No Yes No <br />groundcover, mulch, etc. Will comply with Erosion <br />will be installed as soon as Control Ordinance and Neuse <br />practical after construction River Buffer rules. <br />activities for each phase <br />are completed. <br />C:\Documents and Settings\RdavislDesktop\Efland Commons\Staff Findings for Efland Commons PD.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.