Orange County NC Website
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />AND <br />PLANNING BOARD <br />QUARTERLY PUBLIC HEARING AGENDA ITEM ABSTRACT <br />Meeting Date: August 25, 2008 <br />Agenda <br />Item No. C -1 <br />SUBJECT: Efland Commons Subdivision Planned Development Zoning Atlas Amendment <br />and Class A Special Use Permit for Preliminary Plan <br />DEPARTMENT: Planning & Inspections JOINT PUBLIC HEARING: Y/N YES <br />(BOCC and Planning Board) <br />ATTACHMENTS: <br />1-Recommended SUP Conditions & PD Ordinance INFORMATION CONTACT: <br />2-Recommended Findings Robert P. Davis, Planner III, Ext. 2580 <br />3-Neighborhood Information Meeting Summary <br />4-Biological Inventory TELEPHONE NUMBERS: <br />5-Environmental Assessment Memo Hillsborough 732-8181 <br />6-Agency Review Comments /Fiscal Impact Chapel Hill 968-4501 <br />7-Legal Ad/Certification Letter to Owners <br />Durham 688-7331 <br />8-Application/Supporting Documents Filed <br />9-Site Plan Maps Mebane 336-227-2031 <br />PURPOSE: To receive public comments and evidence regarding the proposed 45-lot Efland <br />Commons Major Subdivision Planned Development Zoning Atlas Amendment and Class A <br />Special Use Permit /Preliminary Plan. <br />Information: This. petition for rezoning is necessary in order to accommodate the proposed <br />density of the project. The current zoning district and watershed density allow a maximum of <br />one unit per acre, or approximately 11 lots. The proposed density of this project is 3.5 units per <br />acre, which is in accordance with anticipated densities in the designated transition areas of the <br />Land Use Element of the Comprehensive Plana Currently, a large part of land in the transition <br />areas is zoned for 40,000 square foot lots with 1-acre maximum densities. Therefore, in order <br />to allow increased densities in the transition areas rezoning will be needed. <br />A Class A Special Use Permit (SUP) is required of all Planned Developments regardless of the <br />number of lots created. Under current regulations this project would need a SUP per the <br />Growth Management System Map (Urban Designated Area) provisions under the current zoning <br />classification only if exceeding 40 lots total or subsequent to a general use zoning atlas <br />amendment that increased permitted density to accommodate over 40 lots total. A Planned <br />Development proposal allows the project to be reviewed comprehensively with zoning, density, <br />the SUP for Growth Management System, and the Preliminary Plan considered simultaneously. <br />Procedures for Planned Development and Special Use Permit, Class A Hearings: <br />• Chair of Board of County Commissioner opens meeting and turns meeting over to Planning <br />Board Chair. <br />