Orange County NC Website
~s <br />Name: Dorothy Baldwin, <br />Address: 1709 Rusch Rd. <br />City: Chapel Hill, N.C. 27516 <br />Phone: 967-236'0 <br />Date: 7anuary ~, 200$ <br />.Page 10 <br />BEDRQUMS # ~, # 2 & # ~c <br />1. Remove the bed molding around the ceiling, Locate framing and <br />caulk lines across ceiling. Install %z" sheetrock using I '/4"-2" <br />:screws or sheetrock nails. Note: All. screws and nails to be driven <br />-into solid. framing. Finish sheetrock smooth and prime with-a <br />latex construction primer... <br />2. Install three (3) inch crown molding in the bedrooms. <br />Note: All lengths less than 16' shall be install in one section, <br />Alt corners and joints to ft properly. Prime new crown molding: <br />with an oil based primer.. <br />~. Prepare the walls, ceiling and trim for paint. Fill. any holes and <br />damaged areas on the walls with sheetrock filler. Caulk all. seams <br />and cracks with latex. caulk. Clean walls as necessary to provide <br />properbond. Paint the wails and ceiling with flat latexpaint. <br />Paint the trim and doors with semi-glass latex paint. All. <br />paint shallcover completely. Note: Trim all daors'to close <br />and latch before painting. <br />FI.~OOR SYSTEM REPAIR: <br />1, Install five (5) pressure treated floor joists_:under the living room <br />floor: Double the existing joists using matching sized lumber:. <br />Nail the new joist to the existing joist.. <br />2. Install two (2) pressure treated dropped girders .along the entire. <br />span of the floor system..Center the dropped girder %z span between <br />the front and rear section. Install a triple 2x$ dropped girder.. <br />Install adjustable metal post jacks 84" OC. The post jacks. <br />must rest on solid masonry approved by the Orange County <br />Inspection Dept. Ievel floor. using string Imes and. raise floor <br />with post jacks. Do not raise floor more than `/4"per day to <br />avoid cracking wall covering.. <br />3:. Install a galvanized metal termite shield on-the exterior foundation. <br />walls. In 12 feet sections, jackthe floor system :approximately 3116" <br />and slide the termite shield in from the exterior. NOTE: Work to be <br />performed'before vinyl siding is installed. <br />