Browse
Search
Agenda - 08-19-2008- 4x
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 08-19-2008
>
Agenda - 08-19-2008- 4x
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 12:07:50 PM
Creation date
9/10/2008 12:03:59 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4x
Document Relationships
Minutes - 20080819
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Name: Dorothy Baldwin <br />Address.1709 Rusch Rd. <br />City: Chapel Hill, N.C. 27516 <br />Phone: 967-2350. <br />Date: January 2, 2008 <br />BATI~ROOM• <br />5'. Prepare the floor for vinyl. Instal1318" BC plywood and a <br />stew vinyl. floor. The vinyl to cost not:less than $ I4.00 sq <br />yard. Install metal trim where the vinyl meets the hall <br />floor. Note: New underlayment to be properly installed- <br />and nailed. <br />6. Install new 4 Y." molded baseboard and shoe molding. Prime <br />the new molding with an oil based primer.. <br />Fage 9 <br />7. Prepare-the walls and ceiling for 1VIR sheetrock. Note: Install mold <br />resistant wall covering; in the tub/shower area. Install 'ls" wall board. <br />and finish smooth. Note: All sheetrock fillerto be properly finished <br />and sanded. Apply a new construction primer to the walls <br />and: ceiling; <br />8: Install a five piece accessary kit. The kit to include two, twenty- <br />four inch towel bars, soap dish,, tumbler holder and paper <br />holder. Note: Install all. necessary framing,in wall to secure <br />hardware. <br />9. Install a surface mount medicine cabinet above the sink. <br />10 Prepare all;surfaces for paint. Fill all nail holes and caulk all <br />necessary seams.. in trim. Paint the walls, ceiling and trim with., <br />semi-gloss latex paint` All paint to cover completely; <br />11. Remove the door unit in the bathroom., Re-frame opening to <br />receive a 32" b-panel 1 3l8" interior door pre-hung unit.: <br />install a new 37 inch header and filler studs. New door to open,.. <br />close and lock properly. `Install a privacy lockset and door <br />bumper. Door to swing in along right wall at kitchen. <br />Prime all bare wood with an oil primer:: <br />12 Install two (2) 24" stainless steel 1 '/a" grab bars in the tub! <br />shower area.. Install all necessary blocking to secure the: <br />grab-bars. Consult'hameowner for grab bar location. <br />
The URL can be used to link to this page
Your browser does not support the video tag.