Browse
Search
Agenda - 08-19-2008- 4x
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 08-19-2008
>
Agenda - 08-19-2008- 4x
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 12:07:50 PM
Creation date
9/10/2008 12:03:59 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4x
Document Relationships
Minutes - 20080819
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`~ <br />Name: Dorothy Baldwin. <br />Address: 1709 Rusch Rd. <br />City: Chapel Hill, N.C. 27S 16 <br />Phone: 9b7-2364 <br />Date: January 2, 208 <br />KITCHEN / HALLVV.AY <br />1. Repair the °sagging ceiling tiles.. on the kitchen ceiling. Use 1 '/4"' <br />screws with one inch fender washers to screw tiles back to framing. <br />Remove bed molding in kitchen and_hallway. Locate framing on entire <br />ceiingf Using a challc box pop lines across,raani for sheetrock <br />installation. <br />Page' 7 <br />21. Install %2" sheetrock on the kitchen and hall. ceiling. Finish sheetrock <br />smooth. Note: Refer the Rehabilitation Specifications for new <br />sheetrock installation. Prime the ceiling with a new construction <br />primer: <br />3. Remove the base cabinets, countertop and wall cabinets in the <br />kitchen. <br />4, remove the top layer of vinyl flooring and sub-floor in the kitchen,. <br />Note: Rehabilitation Specialist to inspect floor at kitchen sink area,.. <br />If further damaged exists in this location, the Contractor, Qwner and <br />Rehabilitation Specialist will access damage,, determine acourseof <br />action and change order for cost of additional work. <br />S: Prepare the floor for vinyl. Insta113/$" BC plywood (finish grade) <br />on the floor and a new vinyl floor. Note: Properly nail the new plywood. <br />Install plywood: using nails or staples: approved for flooring. <br />Install a new vinyl.. floor..''The vinyl to cost not less than $ 14.40 sq yard. <br />Install metal trim at door-and hall opening. Install shoe molding at all <br />wall and cabinet areas. Prime and paint the shoe molding. with an oil <br />based primer and paint with senu-gloss latex paint.. <br />b Install new base cabinets, wails cabinets and rolled=back formica <br />counter-tops in the kitchen. Refer to plan. Install approximately I2' <br />of base. cabinet and 14' wall cabinet. Note:.:New cabinets shall have <br />hardwood fronts and a factory finish.'New cabinets and counter-fops <br />to be installed properly. Owner to choose finish, white or oak <br />finish, <br />'~. Install a 12" x 12"dropped soft for all wall cabinets. Install <br />framing, sheetrock and finish sheetrock smooth. <br />
The URL can be used to link to this page
Your browser does not support the video tag.