Browse
Search
Agenda - 08-19-2008- 4x
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 08-19-2008
>
Agenda - 08-19-2008- 4x
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 12:07:50 PM
Creation date
9/10/2008 12:03:59 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4x
Document Relationships
Minutes - 20080819
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~i <br />Name: Dorothy Baldwin. Page 6 <br />.Address: 1709 Rusch Rd. <br />City: Chapel Hi11,~ht.C. 27516.- <br />Phone: 967-2360 <br />Date; January 2, 2(}0$ <br />PLYJMBING <br />'11. Install an expansion tank for the water heater per code,.. <br />12. Install awater-pressure. reducing valve or regulator on the supply <br />line per code. <br />13. Install amain water shutoff valve within 3 feet of the crawlspace <br />door opening. <br />14 Install pipe insulation on all supply lines in the crawlspace.: <br />Note: Insulation to be properly installed. All corners to be cut at <br />45% angle and shall fit properly. <br />MECHANICAL: <br />1. Remove all :supply ductwork to the main trunk line. Install insulated <br />flex duct to all rooms. Contractor to apply mastic at all connections: <br />to :seal ductwork. properly. Mechanical contractor to support and strap <br />all ductwork per mechanical code. Note: New ductwork to be inspected, <br />by Chapel Hill Inspection Dept. <br />2. Using proper duct tape, re-tape all existing duct insulation on the <br />trunk line: Apply mastic to all joints. to proper seal ductwork.. <br />INSULATION: <br />1. Replace approximatelyhvo (2) rolls ofR-19 faced insulation in <br />the ci~awlspace. Secure. all loose insulation with extra tiger teeth: <br />2. Install R 13 insulation in the exterior wall of the bathroom.. <br />3. Add. blown insulation in the attic to achieve: an R-3~ rating.: <br />Insulation .contractor to provide paperwork of R-value and <br />number of bags insulation for the insulation inspection.: <br />Install insulation baffles per cage...: <br />
The URL can be used to link to this page
Your browser does not support the video tag.