Browse
Search
Agenda - 08-19-2008- 4x
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 08-19-2008
>
Agenda - 08-19-2008- 4x
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 12:07:50 PM
Creation date
9/10/2008 12:03:59 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4x
Document Relationships
Minutes - 20080819
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />Name: Dorothy Baldwin Page 2 <br />Address: 1709 RuschRd. <br />City; Chapel Hill, N.C. 27516 <br />Phone; 967-23b0 <br />Date;: Ianuary 2, 201?8 <br />EXTERIOR: <br />8'. Install a new 3b inch, white aluminum storm door. Storm door to be <br />full view: Storm door to be complete with Iever handle, screen, closer <br />and vinyl sweep. Note: New storm door to open, close and lock <br />properly. New- storm door to be of premium quality. Install a <br />Larson orpre-approved .equal. <br />WINDUWS <br />I,. Re-frame the window openings in all bedrooms to receive a <br />32" x 54" window. (Egress Code) Note: The existing headers <br />to remain.. Ike-frame a total: of six (6j window openings. <br />2. .Install new double-hung.: vinyl: construction windows with. nailing: <br />flange. Sizes-: 7- 32" x 54", 2- 32"x..38", 2- 2U" x 54" and one <br />picture window, 48" x 54". Install a total of'eleven (11) windows and <br />one (1) picture window.. Install jamb extensions, new matching .casing, <br />window stool and apron.. Prime. all new trim with an oil based primer. <br />Paint new trim with semi-gloss latex paint. All paint to cover <br />completely. <br />3; Reinstall alI existing vinyl shutters.. <br />GUTTERS/DRAINTILE <br />1. Install white atuniinurn guttersand over-sued downspouts on all <br />fascias including, the back porch. New gutters to be seamless. <br />Install solid drain file to all downspouts. The-drain file on' the drive- <br />way side shall terminate not less than 1©feet from the foundation. <br />NOTE: Contractor to consult with Rehabilitation Specialist abort. <br />location of downspouts. <br />2; install aluminum gutters guards on alT gutters. Note: Gutter guards <br />to be installed properly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.