Browse
Search
Agenda - 08-19-2008- 4x
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 08-19-2008
>
Agenda - 08-19-2008- 4x
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 12:07:50 PM
Creation date
9/10/2008 12:03:59 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4x
Document Relationships
Minutes - 20080819
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3~ <br />Name: Dorothy Baldwin.: <br />Address- 1.7019 Rusch Rd. <br />City: Chapel Hill, N.G 27516 <br />Phone: 967-236U' <br />Date: January 2, 2Q0$ <br />EXTERIOR: <br />1. Contact an Asbestos Removal Company to remove the asbestos <br />siding. from bath aides of the unit. (432 sq ft}. <br />:Asbestos Contractor to properly dispose of the asbestos at an <br />approved landfill or site. Asbestos contractor to provide Waste, <br />Shipment Record of disposal'. <br />2. Remove the masonite;siding and trim;from the front and back of'the <br />unit.. Remove all exposed, nails and prepare walls far vinyl;siding. <br />3. Remove all:existng 1x8 fascia and soffit around the unit. Install new <br />lx8 fascia. New trim to be # is grade: yellow pine, cedar or fiu. <br />Prime the,new trim with an oil based primer. Install new trim with <br />galvanized nails. <br />4. Prepare the over hangs for vinyl soffit. Install all necessary framing; <br />to secure all soffit and 7-channel, <br />5. Prepare the exterior walls and boxing. for vinyl siding artd <br />aluminum trim. Install double five (D-5} vinyl siding and fan-fold <br />insulation on the exterior walls. Install white. aluminum coil stock <br />on the fascia and vented vinyl soffit on the aver-hangs. Install all. <br />necessary trim, J-channel,flashing and'.: starter etc. Refer to-plan <br />for fascia trim. Cover the front and back doorframes with aluminum <br />coil.stock. NOTE: All trim to be properly installed. Install.:proper <br />trim/light fixture boxes (vinyl..) for all exterior fixtures.:. <br />Note: Refer to General Specifications for Rehabilitation for vinyl.: <br />siding and aluminum trim. <br />6. Install anew pressure treated crawlspaee door and. frame: ':Install a <br />2x4 frame and'f," plytivood door. Install door stop, :galvanized hinges: <br />and locking hasp. New door to open, close and Latch' properly. <br />7. Install a new 36 inch, G-.panel metal insulated door unit on the fron#. <br />Install a keyed lockset and deadbolt -keyed alike. New door to open,:: <br />close and lock properly. Install-.new matching casing an the interior. <br />Prime the casing with an oil passed primer; <br />
The URL can be used to link to this page
Your browser does not support the video tag.