Browse
Search
Agenda - 08-19-2008- 4x
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 08-19-2008
>
Agenda - 08-19-2008- 4x
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 12:07:50 PM
Creation date
9/10/2008 12:03:59 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4x
Document Relationships
Minutes - 20080819
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: tlrlartrina 1Vlorrow Page l0 of 12 <br />Address; 109 Starlite Drive ~ °~ <br />City: eanboro <br />~- Phone ~; 968-9098 <br />Date.: Sf 1 Sl08 <br />paint-grade wood crown.. mold on ceiling/wall joints,. sealed and <br />backprirned. Supply and install` new stained wood crown mold on <br />ceingfwall cabinet joints.. <br />2. Remove, clean and repair existing base cabinet doors, and clean and repair <br />associated cabinet frames: Replace existing floor inside. sink base cabinet, <br />Replace base cabinet door hinges to match existing as close as practical.. <br />Replace all base and wall cabinet door and.. drawer handles -and install door' <br />closure clips.. Re-install existing. cabinet doors. Clean and re-caulk. <br />countertop/wall joints with smooth uniform finish. New color to match. <br />existing as Close as practical,: All work complete.: <br />B. DINING AREA <br />1. .Remove whole house fan.. Install framing and sheetrock to repair. <br />remaining. opening to match adjacent ceiling includmg tape and blend.. <br />sheetrock. Texture repair surface to match adjacent ceiling texture. New <br />materials to match existing as close as practical. <br />$' <br />~. Remove- trim. Qn KtchenlDinng pass~through opening. Re-secure <br />existing wall paneling in Dining Area. Supply and install. new trim on <br />pass-through opening, new outside corner trim and new inside-corner trim <br />and,:restore paneling to proper working order:. <br />C. BATHROOM <br />1, Protect existing. cabinets,. countertops and fixture from. dust and debris. <br />Prepare ceilings in three rooms of Bathroom to accommodate sheetrock: <br />overlay including remove existing ceiling light fixture and adjust existing: <br />electrical.. and HVAG: register to new ceiling IeveL Supply and install new <br />"moisture resistant .sheetrock and taping to blend and match existing <br />and have smooth transition to existing walls. Supply and install. new <br />paint-grade wood crown mold on eeiling/wall joints, sealed and <br />backprimed. All new materials, finish surfaces and .finishes to match <br />existing as close as practical'..... <br />$` <br />2, Properly repair, clean and prep existing fiberglass tublshower uni# fore <br />resurfacing. Properly resurface existing tubJshower unit with smooth, <br />uniform finish bonded to existing unit. New color to match existing as <br />close as practical, <br />
The URL can be used to link to this page
Your browser does not support the video tag.