Browse
Search
Agenda - 08-19-2008- 4x
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 08-19-2008
>
Agenda - 08-19-2008- 4x
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 12:07:50 PM
Creation date
9/10/2008 12:03:59 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4x
Document Relationships
Minutes - 20080819
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ilaine: l~fartrina lriorrow <br />~ldcaress; l09 Starlite Drive <br />City: Carrboro <br />-~ `Phone #: 968-9098. <br />Date: 5115/08 <br />Page 9 of 12 ~i <br />L. FLOOR COVER <br />1. Remove existing vinyl floor cover in Entry, Entry closet, Laundry closet,. <br />Kitchen,, Dining, Hall, two Hall closets and three rooms of Bathroom to <br />expose .concrete floor slab. Remove baseboard and shoe mold in Entry <br />and right side wall in Dining. Remove shoe mold: in all three rooms of <br />:Bathroom. Prepare existing slab and baseboard for smooth installation of <br />new vinyl floor cover. Supply and.. install new painted wood baseboard. <br />where existing: was removed including. replace missing baseboard in <br />Laundry closet: Supply and install new vinyl Hoar cover per Owner <br />selectian,_new,painted shoe mold where existing-was remflved:or missing,., <br />new stained shoe mold in Kitchen, and new metal transition .strips,.. <br />.complete. New materials to match existing as close as practical. <br />2 Remove existing carpet and. pad to expose concrete ..floor slab in three. <br />Bedrooms: including Bedroom closets. Prepare existing. slab and <br />baseboard. for smooth installation of new wall-to-wall pad and carpet. <br />:Supply and install. new pad and: carpet per Owner selection at same <br />locations, including inside Bedroom: elasets, complete. New materials to <br />match existing as close as practical. <br />M. GENERAL, REPAIRS <br />1. Supply and install new address numbers on'exteriar of house near front: <br />door and visible from the street: <br />2: Supply and install new 2X12 wood framing to create a "dam" in attic <br />around attic stair opening to contain insulation. Repair disappearing'stairs <br />to close properly and re-secure insulation panel un stairs.. <br />N.: SITE IMPROVEMENTS <br />1. Re-grade soil on right side of house to slope away from house <br />approximately 4 feet. and to slope toward front of property. <br />II; INTERIOR WORK <br />A. KITCHEN- <br />1. Protect existing cabinets, countertops and ,appliances :from dust and debris. <br />Remove trim from old ceiling repair. Prepare. .ceiling to acconunodate <br />sheetrock overlay including adJust existuag electrical, ceiling light/fan <br />fixture and I-IVAC register to new ceiling level. Supply and install. new <br />%" moisture resistant sheetrock and taping to blend and match existing <br />and have smooth transition to existing walls..- Supply and install new <br />
The URL can be used to link to this page
Your browser does not support the video tag.