Orange County NC Website
fVame; ivlartruna iVlorrflw Page '~ of 1 ~ 02~ <br />Address: T09 Starlite Drive <br />City: Carrnoro <br />Phone #; 9b8-9098: <br />bate: 5/1 SI08 <br />I. E~TERIQR SIDING AND TRIM. <br />1. Remove approximately 90 lineal feet of damaged bottom siding.. board an <br />the front.. wall,. right side walls, and rear walls and replace with pressure. <br />treated good material to provide substrate for new fan•#'oid insulation and <br />vinyl siding. Remove approximately three square feet of damaged siding: <br />adjacent to top ofrear Bedroom window and replace with wood to provide <br />substrate for- new fan-fold insulation -and vinyl. siding. Remove. <br />approximately six square feet of siding and substrate -from rear wall to. <br />provide access to .attic to remove abandoned. HVAC unit. Remove <br />abandoned HVAC unit form attic. Repair opening to provide. substrate for <br />new fan-fold insulation and vinyl siding, Remove existing wall-mounted. <br />A/C unit in Dining area: Repair wall framing and interior sheetrock to <br />match existing as close: as practical 'and;to provide substrate for new fan <br />.fold insulation and vinyl siding,. ' <br />2. Clean existing: vented. soffit screens to restore to proper working order:.. <br />Clean and. properly prep existing soffits, roof overhangs, fascia and rake <br />trim to accommodate installation of new pre-finished white aluminum. coil.. <br />stock. Supply and install.. new 2X pressure treated. wood overlay on <br />existing rake trim to accomriiadate installation of new aluminum coil stock- <br />and new vinyl siding. Maintain existing exposed vented soffit screens and- <br />supply and. install new pre-finished white aluminum coil stock to cover <br />remaining exposed woad. components o£ soft t. Supply and install pre- <br />finished white aluminum. coil. stock on existing fascia, on rake trim overlay' <br />and on roof overhangs. Includes wood spacers on existing components to <br />create uniform finished surfaces. All bends and folds of coil stock to be <br />done with metal brake equipment and exposed :finished edges. to be <br />hemmed:. All work complete:: <br />3. Fully prepare existing: siding on exterior of house to accommodate: <br />installation of new fan-fold insulation and new vinyl siding. Fully prepare <br />existing front porch soffit to accommodate installation of new vinyl soffitt: <br />Supply and install new fan-fold insulation and new vinyl'. siding over <br />existing siding, :and new vinyl soffit over existing front porch soffit,.. <br />including all neeessarytransitons, mounting blocks for exterior fixtures, j- <br />channel and trim, complete: Includes remove existing. shutters and. <br />supply and install two (2} new vinyl shutters on Kitchen window and two <br />(2) new vinyl shutters on front Bedroom window, complete. Color and.. <br />style per Owner selection. ..Existing phone and cable lines.- to remain: <br />accessible. <br />