Browse
Search
Agenda - 08-19-2008- 4x
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 08-19-2008
>
Agenda - 08-19-2008- 4x
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 12:07:50 PM
Creation date
9/10/2008 12:03:59 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4x
Document Relationships
Minutes - 20080819
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: 1~artrna 1~Iorrow <br />.: address: 1(?9 Starlite Drive: <br />City,.. Carrboro <br />~; Phone #: 968-9t}98 <br />:Date. 511 ~/08 <br />.. :- Y~ i <br />Page ~ of 12 <br />:fixture. adjacent to rear door. Supply and install. new electrical to <br />accommodate installation of one new exterior double light motion detector <br />light fixture on right rear corner ofhouse and controlled with existing rear <br />door light switch, .Supply and install: one new single light motion detector: <br />light fixture for front porch, one new' double light motion detector light. <br />fixture adjacent to ..rear door,. and one _new double light motion detector:. <br />light fixture on right rear corner of house, complete. Ali... work. to code... <br />$: <br />E. AgECH.ANICAI; <br />1. Provide service and. repair of existing furnace unit- to maintain. proper <br />working order and accommodate installation of new- split system air' <br />conditioning unit. Supply and install new split system air conditioning: <br />system, including nevv condenser located at exterior,: condensate lines, <br />thermostat, complete.. Includes cleaning existing coil. All work to Bade... <br /> <br />2, Replace ten (10) ceiling-mounted heater registers with new white pre- <br />finished heater registers of same -size and at same locations, complete,. <br />Includes sealing:-duct boots where they penetrate the ceiling,. <br />F. INSULATION & W EATHERIZATiON <br />1, Supply and install blown-in insulation to achieve R-30 value in entire attic <br />of house, complete. Includes supply and install. baffles at soffit vents to- <br />provide proper air flow between attic and vented soffits. <br />$' <br />G. EXTERIOR DOERS <br />. 1. Remove existing front :screen door: Remove existing front .door and door... <br />frame and ;prepare opening for installation of new pre-hung exterior. door.: <br />Supply and install new pre-hung white pre-primed, solid wood core, n- <br />panel metal insulated exterior door, with aluminum threshold and <br />weatherstripping` (no windows). Includes all hardware,. lever-style keyed <br />lockset, deadbolt and peephole,: complete. Where exterior wood frame,. <br />trim. and sill are exposed, supply and install pre-finished white aluminum <br />coil. stock to cower exposed wood: components, including wood spacers an <br />existing components to create uniform surfaces. Ail bends and folds of <br />coil. stock tc> be done with metal brake equipment and exposed finished <br />edges to be hemmed. Includes replace inferior. trim to match existing as <br />close as practical. Includes supply and install new exterior .latex enamel. <br />semi-gloss paint finish on dour. <br />
The URL can be used to link to this page
Your browser does not support the video tag.