Browse
Search
Agenda - 08-19-2008- 4x
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 08-19-2008
>
Agenda - 08-19-2008- 4x
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 12:07:50 PM
Creation date
9/10/2008 12:03:59 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4x
Document Relationships
Minutes - 20080819
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L'1 ame. iY141 LL Lia ~~/~V i 1 V ~'T <br />Address: <br />....... 09 Starlite Drive <br />City: Carrbaro <br />Phone #: 968-9098. <br />:Date.. 5! 15!08: <br />a ~ e <br />-- <br />Page 3 of <br />Nate; Prior to conducting Lead-Based Paint Abatement activities, all personnel: <br />associated with the project should review and fully understand the requirements of <br />ALL applicable local, state, and federal regulations that may apply to the warksite. All <br />work to be doge ire accordance with the Lead-based Paint InspeetionlRisk Assessment <br />Report conducted by Environmental Testing Services, Tnc. and dated April 29, 200$. <br />I. W4RKSITE PREPARATION <br />A:. GROUND CQNTAINMENT <br />I. Before exterior construction,. construct a work site- perimetez curb of <br />3x4 timbers ten (l;Oj feet from the house exterior. Create an outer <br />barrier of flags andlor plastic tape three (3j feet an center and twenty <br />{20) feet from the warksite. Fost proper signage in the work area All <br />warning signs must remain posted until clearance... is passed:: <br />$` <br />2 :During the period of work.. on all, exterior components attach. one layer <br />of 6-miI polyethylene to the building exterior with furring strips,:.. <br />extending the (10) feet Bast the work. site.:.: Wrap, the plastic under the <br />perimeter 2x4's. Change the plastic daily. <br />B. PRE-Ci,EAN <br />l . Pre-clean the interior of the unit including clean and.. I-iEPA vacuum. all <br />horizontal surfaces, to include all floors,. windowsills, troughs, <br />laaseboards and casing, <br />C. CLEARANCE. EXAMINATION <br />1, After completion of all work that disturbed LBP and any other lead.. <br />hazard reduction activities, a gvalif ed person shall perform a <br />clearance examination. Lead. remediation work is not. considered <br />cornplefe until a positive clearance ~•esult is achieved.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.