Browse
Search
Agenda - 08-19-2008- 4x
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 08-19-2008
>
Agenda - 08-19-2008- 4x
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 12:07:50 PM
Creation date
9/10/2008 12:03:59 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4x
Document Relationships
Minutes - 20080819
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- .•, ~, ~ i <br />:dame. Nlartr~na 1liforrow Page 2 of <br />address: 109 StarIite Drive <br />City; Carrboro <br />Phone 9b8-9098 <br />Date; 5/15/0$ <br />This set" of work specifications outlines. work' ':items. `that were found to contain lead in <br />concentrations above. acceptable levels as set in the U. S. Department of Housing and Urban <br />Development (HUD) :standards. It is recommended that any lead hazard remediation work be <br />conducted by workers who are certified by the state to perform lead abatement work.. <br />Lead hazard retnediation work must be preformed in compliance with the regulations issued,. <br />by the Secretary' of Housing and Urban Development :set forth in 24 CFR Part 35, et al and <br />alI applicable rules and any others- issued. thereunder,. and alt applicable Federal,.... State and <br />Local rules and. regulations, regarding notification, evaluation and .:reduction of lead-based <br />paint :hazards in residential structures undergoing Federally-assisted canstruetion r~r <br />rehabilitation and require the elimination. of lead-based paint; Hazards. every contractor or <br />sul3cantractor, including painting, pursuant to which such Federally-assisted construction or <br />rehabilitation is performed, shall include appropriate provisions complying with requirements< <br />for notification, evaluation anti reduction of lead-based paint hazards. <br />The contractor. shall be allowed to include in the. cost a~ the. project the allowable fee far one <br />(1) complete clearance inspection:. of the remediation work; :performed... The cost of any <br />additional clearance .inspections which: may be necessary will be barn directly by the <br />contractor:, <br />Contractor must submit a copy of training certification with their bid. <br />
The URL can be used to link to this page
Your browser does not support the video tag.