Browse
Search
Agenda - 08-19-2008- 4x
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 08-19-2008
>
Agenda - 08-19-2008- 4x
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 12:07:50 PM
Creation date
9/10/2008 12:03:59 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4x
Document Relationships
Minutes - 20080819
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~f 3 <br />Name: Eliza Torain Page ? <br />Address: 225 W. Orange St. <br />City: Hillsborough, N:C. 272']`$ <br />Phone:: 732-853 <br />.Date: April 1 ~, 2Q08 <br />KITCHEN / DIMING R04M'& HALL <br />1. Remove al cabinets, sink and countertop in the kitchen, <br />2. Install new base and wall cabinets. Owner to choose finish.- <br />( white or oak finish) The cabinets shall have hardwood fronts <br />aitd a factory finish. All-hardware to be self-closinghinges with <br />matching gulls or knobs. All exposed<edges to be flash with factory <br />finish. <br />3, Install a rolled back formica counter lop. Nofe: Owner to choose <br />color/finish( White, almond etc) Note. WaII end of countertop to <br />back-splash. installed. All edges to he finished. <br />4. Prepare the floor for vinyl. Install 3!8" BC plywood. in the'kitchen/ <br />dining room floor. Install l~" lauan plywood on the hall floor:: <br />Nate:. All plywood and vinyl. to be properly installed. <br />The`vinyl to cost not less than: $ 14:Oi1 sq. yard, Install new metal <br />trim.. where vinyl meets hardwood or carpet. <br />5. Install new wood shoe molding at all cabinet and wall areas.. <br />Prime the shoe molding with an oil based primer. Fill all mail <br />holes and. prepare fox paint. <br />BATHROOMc. <br />1. Remove the following items in,the bathroom; Commode,.. <br />sink, door unit,. window .and wall covering and file to the framing: <br />NOTE: Do not damage tub and wall mount sink. <br />2. Frame the window opening with 2x4 framing. Install sheathing. <br />on the exterior. Fur opening to existing wood siding and. install. <br />fan fold insulation and vinyl siding.. Contractor to match <br />color'as close as possible. Note: If new vinyl siding is not a close <br />match. The Owner, Contractor and Rehabilitation Specialist will <br />meet to review the work, determine a course of`action and,. if <br />necessary, a cost for any additional work.. <br />3: Install 2x8 framing for two (2) grab bars in shower area. Consult <br />owner for location.... <br />
The URL can be used to link to this page
Your browser does not support the video tag.