Browse
Search
Agenda - 08-19-2008- 4x
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 08-19-2008
>
Agenda - 08-19-2008- 4x
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 12:07:50 PM
Creation date
9/10/2008 12:03:59 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4x
Document Relationships
Minutes - 20080819
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~a <br />Narne Eliza Toran <br />Address: 225 W. Qrange St. <br />City: Hillsborough; N.C. 272"18 <br />Phone: 732-8543 <br />Date: April 1 S, 2008' <br />4. Install afrost-proof water spigot on the back of the unit. <br />.Make all plumbing connections.: <br />5 Install a new single lever faucet.. with sprayer in the, kitchen: <br />Note:: The faucet to be a Delta orpre-approved equal. Install. <br />new drain line assembly/p-trap,::; supply lines and cut-offs. <br />6: Install a new handicap commode, supply line and cut-off. <br />Nate: The new commode to be a Kohler, Crane or <br />American Standard orpre-approved equal. Supply new <br />wax seal and bolts:. Note: Remove all threaded nipples to <br />cutoffs. Install copper or pex fittings.. <br />Page 6 <br />7: Install a single lever combination tub/shower valve: The. valve. <br />to be aDelta orpre-approved equal. <br />8. Install a hand held shower with'two (2) wall clips. `Install one clip <br />atregular shflwer head Height and the second clip approximately <br />40" fibm the bottom tub surface:. <br />9. Reinstall the existing wall mount sink: Install a new single lever <br />faucet, Sink faucet to be a Delta orpre-approved equal.. Install new <br />drain line assembly/p-trap, supply lines and cut-offs.. <br />Note: Remove any threaded nipples in-wall to cut-offs. <br />install copper or pex fittings. <br />10. Install a new trip lever/drain lneJp-trap assembly for the tub.. <br />Mahe all plumbing connections to code: <br />11. Install a PVC wall. panels in the shower. Install three wall panels <br />to properly fit shower walls, Caulk all coixiers and base wt11 100% <br />tub~shower silicone :caulk. Panel base and corners to be water tight:. <br />12; Install a main water cut-off within 3 ft of the crawlspace door <br />opening. Install. a lever type water cut-off valve. <br />13. Install a water pressure reducing valve or regulator on the supply- <br />line per code. <br />14.; Install an expansion tank for the water heater per code: <br />
The URL can be used to link to this page
Your browser does not support the video tag.