Browse
Search
Agenda - 08-19-2008- 4x
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 08-19-2008
>
Agenda - 08-19-2008- 4x
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 12:07:50 PM
Creation date
9/10/2008 12:03:59 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4x
Document Relationships
Minutes - 20080819
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />Name: Eliza Torain Page 5 <br />Address: 22S W. Orange St. <br />City: Hillsborough, N.C. 27278 <br />Phone: 732=8543 <br />Date:-Apri1,15, 2008 <br />IN3ULATI01'~: <br />1. Ilistall R-19 floor insulation in the crawlspace: Nate: All insulation. <br />to be properly installed. and inspected_by Orange County Inspection <br />Dept, <br />2 Remove all debris from the crawlspace and prepare crawlspace for <br />~-mil poly... Level all high areas of soil and fill in low sections against <br />lower side wall. install 6-mil poly in the crawlspace. <br />3 Install R-13 insulation in the exterior bathroom wall.. <br />MECHANICAL: <br />1. Install a new gas pack HVAC system: Mechanical system to be <br />sized in accordance with.ASHRAEJManual "J"'.specifications and... <br />ductwork design. to be in accordance with ASHRAElManual "D" <br />specifications. New heatlar system shall be a complete operational <br />system. All work to pass current Mechanical Codes, Price to include <br />floar_registers gas piping, thermostat, ductwork and permit... <br />NOTE: Mechanical Contractor-shall furnish papeitivork to <br />certify meeting the above requirements. <br />Note: Gas. room heater in living room to remain in unit; _ <br />~, Remove the vent less gas wall heater in the,halltivay. Remove all <br />gas piping in the.hallway. Cap off gas lines`n crawlspace.. <br />PLUMBING: <br />1. Install new PVC` drain lines. to all fixtures. New drain lines to meet <br />cun-ent plumbing code. Install all necessary cleanvuts and vents per <br />code. A penilit is required and work to be inspected by Orange <br />County Inspection Dept... <br />2. Install a sewer cleanout within 3 feet of the foundation wall. <br />Work to pass plumbing inspection. <br />3., Insulate all supply lines in the crawlspace with %"pipe insulation:: <br />Note: New pipe insulation to be installed properly. All corners to be <br />cut on a 45°lo angle and taped,... <br />
The URL can be used to link to this page
Your browser does not support the video tag.