B^"K 7 PAGE 126 <br />'Y <br />An alternate way of providing water and sewer service to this sane area would be to: <br />(1) install the sanitary sewer main in the same location as provided in the foregoing <br />estimate, and (2) install the water main in South Center St. The 12" water line is now <br />in place along South Center Street as far as the east side of the Mattress Factory Road <br />intersection. The following breakdown gives a detailed cost estimate for this proposed <br />installation: <br />A. Construction Cost <br />1. Water <br />4;$00 L.F. 12" C.I. Pipe Water Main G $5.50 $26,400.00 <br />75 L.P. 6"--C.I. Pipe Water Main 03.00 225.00 <br />4 Ea. 12" Gate Valves & Boxes G $218.04 672.16 <br />6 Ea. Fire Hydrants 0 $178.85 1,073.10 <br />2,900-Lbs. C.1. Fittings 9 $0.35 1,015.00 <br />:r70 L.F. 12" Class 250 Mechanical Joint C.I. <br />Pipe in Encasement Q $10.00 700.00 <br />*70 L.F. 2 Steel Encasement Pipe under Railroad <br />Tracks zp42.00 2.94000 <br />Subtotal Tater $33,225.26 <br />2. Sanitar__y__ Sewer $22,159.00 <br />TOTAL COIISTRUCT1011 855,384.26 <br />B. Land and Rights-of ..'ay (Estimated) $ 2,400.00 <br />C. Engineering and Other Technical Services $ 4;320.00 <br />D. Legal, Fiscal, and Other Administrative Costs $ 3,600.00 <br />Project Contingency e3 55 =' j <br />GRAIM TOTAL $69,200.00 <br />The second study covers the installation of water and sewer mains to serve an <br />industrial site located on the south side of S.R. ;'1301 and west of the Mattress <br />Factory Road. A 12" water main is now in place in the Mattress Factory Road. <br />It would be necessary to tap this line and install it in S.R. 7"1301 as far as <br />it is determined desirable to do so. We recommend that, if this installation is <br />made, the line be run approximately 800 feet. ^!The sanitary sewer main would have <br />to be installed all the way from the waste lift station. S:R. =1301 has a rather <br />deep sag approximately 1,000 feet from Iiattress Factory Road and we recommend that, <br />if sanitary sewer is ever installed in this road, it be installed deep enough to go <br />through this sag and provide sewer service to the land beyond it. In order to do <br />this it becomes necessary for the sewer main to be about 21 -feet deep at the <br />IIatthess Factory Road - S.R. ;`1301 intersection. This makes the sewer main installation <br />rather costly, but still much to be preferred over the construction of a second lift <br />station. <br />The following breakdown gives a detailed cost estimate For this proposed <br />installation; <br />A. Construction Cost <br />1. ITater <br />oho L.F. 12" C.I. Hater Hain e $5.50 a 4,400.00 <br />15 L.F. 6" C.I.Water Train C3.00 45.00 <br />1 Ea. 12" Valve & Box C $218.04 218.04 <br />*1 Ea. 12" x 12" Tapping Sleeve with 12" Tapping <br />Valve & Box $800.00 800.00 <br />1 Ea. Fire Hydrant G $178.85 178.85 <br />410 Lbs. C.S. Fittings C $0.35 l43 50 <br />10.0 S.Y. Replace Pavement 3 ;x6.00 60.00 <br />Subtotal Water $ 51845.39 <br />2. Sanitar Sewer <br />06 o r;. F.- 101, V C. Pipe 6-81 Deep G $5.30 w 3,180.00 <br />400 L.F. 10" V.C. Pipe 8-101 Deep C $6.55 2,620.00 <br />200 L.F. 10" V.C. Pipe 10-12T Deep Q -8.30 1,660.00 <br />200 L .r. 10" V.C. Pipe 12-141 beep C 510.55 2,110.00 <br />*200 L.F. 10" V.C. Pipe 114.-16f Deep ?'14.00 2,800.00 <br />200 L.F. 10" V.C. <br />" Pipe 16-181 Deep G 17.50 3,500.00 <br />*2CO L.F. 10 <br />V.C. <br />" Pipe 18-201 Deep C 21.00 4,200.00 <br />*300 L.F. 10 <br />V.C. Pipe 20-22' Deep 925.00 7 <br />500.00 <br />9 Ea. Manholes 0-6 1 Deep C $160.00 , <br />1,0.00 <br />35 L.F. Extra Dept h 14anholes 6-121 Deep `v $25.00 $ 5.00 <br />20 L.F. Extra Depth 1:asiholes Over 12f Deep G $50.00 1,000.00 <br />10.0 S.V. Replace Pavement v. $6.00 60.00 <br /> Subtotal Sanitary Sewer $30,945.00 <br /> TOTAL CONSTRUCTION <br />~ <br />$36,790.391____? <br /> <br />