Browse
Search
Agenda - 10-03-2000-9g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 10-03-2000
>
Agenda - 10-03-2000-9g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 2:40:52 AM
Creation date
8/29/2008 11:21:56 AM
Metadata
Fields
Template:
BOCC
Date
10/3/2000
Document Type
Agenda
Agenda Item
9g
Document Relationships
Minutes - 10-03-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
Minutes - 10-10-2000
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
RES-2000-097 Resolution approving Section Two Beaver Valley Preliminary Plan
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed: <br />Roads: <br />• Access is from Beaver Valley Drive, a new public road to be constructed to state standards. <br />• Beaver Valley Drive extends through Section One from Mace Road, an existing state <br />secondary road. <br />• All roads are to be constructed to NCDOT standards. <br />• Proposed public right-ofi way connection to the western property line. <br />Open Space: <br />• A 150 foot open space buffer is proposed along the stream on the east side of the property. <br />• 8.89 acres; 22.3% common area open space proposed on the conventional plan; 25% in-lot <br />open space. <br />• Minimum to actual lot ratio (MTAR) = 1.97 <br />Water-S®w®r: <br />• Water will be from individual wells <br />• Health Department verified that each lot contains suitable soils to locate a septic system. <br />R®creation: <br />• Cheeks District Park <br />• Dedication of land would be = 1.1 acres <br />• Payment in Lieu = $10,010.00 (22 lots X $455 per lot) <br />• No dedication is warranted because no county recreation area has been identified at this <br />time and the resource protection areas (non transistion areas) are protected by common <br />area covenants. <br />Agency Comments: <br />• Comments attached from Environmental Health and Emergency Management. <br />Develoament Process. Schedule. and Action <br />Planning Board: <br />• First Action: Concept Ptan approved by the Planning Board June 17, 1996. A Phasing <br />Plan was approved by the Board of Commissioners June 30, 1997 with Section One to be <br />completed December 2001. <br />• Preliminary Plan addresses all conditions of approval of the Concept Plan. <br />• Second Action: Planning Board unanimously recommended Preliminary Plan <br />approval August 2, 2000. <br />• Third Action: Board of County Commissioners to consider the Preliminary Plan <br />Options: <br />1. The Board shall consider the application within a reasonable amount of time. <br />2. During deliberations and consideration of the application the Board may defer <br />consideration at any point to pursue additional analysis and review. <br />3. If Preliminary Plan is approved by the County Commissioners the applicant shall <br />ha~re one (1) year to prepare and file a Final Plat or to request aone-year <br />extension from the Planning Director. <br />FINANCIAL IMPACT: 1=fiscal Impact Analysis included as an attachment. <br />RECOMMENDATION(S): Plannind_Sta_ff Approval, in accordance with the attached Resolution <br />of Approval. <br />Planning Board Unanimous Approval, in accordance with the <br />attached. Resolution of Approval. <br />Administration <br />Approval, in accordance with the attached Resolution of Approval. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.