Browse
Search
Agenda - 09-19-2000-9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 09-19-2000
>
Agenda - 09-19-2000-9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 4:35:40 AM
Creation date
8/29/2008 11:21:12 AM
Metadata
Fields
Template:
BOCC
Date
9/19/2000
Document Type
Agenda
Agenda Item
9c
Document Relationships
Minutes - 09-19-2000
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
RES-2000-085 Resolution approving Sunrise Springs Subdivision Preliminary Plat
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2000
RES-2000-086 Resolution approving North Field at Creek Wood Preliminary Plat
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />B. Roads and Access <br />Sunrise Springs Road shall be constructed to standards of the North Catalina <br />Department of Transportation, within a 50' right-of--way with 5 foot utility <br />easements on each side, and the construction shall be inspected and approved by <br />NCDOT. <br />OR <br />A letter of credit or escrow agreement or other security shall be submitted to <br />secure construction of Sunrise Springs Road to the standards of the North <br />Cazolina Department of Transportation. An estimate of the construction cost must <br />be prepazed by a certified licensed engineer or grading contractor and submitted to <br />the Planning and Inspections Department. The financial guazantee must reflect <br />110% of that estimate and be issued by an accredited financial institution licensed <br />to do business in North Carolina. <br />The document describing development restrictions to be recorded with the Final <br />Plat shall state that the financial guazantee will not be released until the road <br />construction has been inspected and approved by NCDOT. <br />2. An erosion control plan for construction of the road shall be approved by the <br />Orange County Erosion Control Division for review and approval prior to <br />Planning Department signatures on final plat. <br />3. Approved street name signs shall be erected at the intersection of streets as <br />required in Section N-B-3-c-12 of the Orange County Subdivision Regulations. <br />Evidence shall be submitted by the applicant that the sign is in place, or a copy of <br />the receipt for purchase of the sign shall be submitted to the Planning Department. <br />4. All lots shall access onto the new subdivision road. No access point shall be <br />located closer than 50 feet to an intersection. <br />C. LancEUse Buffers and Landscaping <br />1. Landscaping shall be installed or preserved as indicated on the approved <br />landscape plan, and must be inspected and approved by the Planning and <br />Inspections Department. A 30-foot Type A buffer, as defined in the subdivision <br />regulations, shall be installed along Sunrise Road. The Type A buffer shall be <br />constructed to be a mixed planting of small deciduous and small evergreen trees. <br />A 100 foot Type F buffer shall be installed along I-40. The Type F buffer shall be <br />constructed of at least 75 % evergreen trees that will be opaque and grow to a <br />height of at least 30 feet. A homeowners association shall be established to <br />provide for maintenance of the buffers to County standazds. <br />
The URL can be used to link to this page
Your browser does not support the video tag.