Browse
Search
Agenda - 09-19-2000-9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 09-19-2000
>
Agenda - 09-19-2000-9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 4:35:40 AM
Creation date
8/29/2008 11:21:12 AM
Metadata
Fields
Template:
BOCC
Date
9/19/2000
Document Type
Agenda
Agenda Item
9c
Document Relationships
Minutes - 09-19-2000
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
RES-2000-085 Resolution approving Sunrise Springs Subdivision Preliminary Plat
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2000
RES-2000-086 Resolution approving North Field at Creek Wood Preliminary Plat
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PHILIP <br />POST <br />ASSOCIATES <br />MEMORANDUM <br />To: Eddie Kirk- Orange County Planning <br />From: Phil Post- Philip Post & Associates,. Inc. <br />Sub,~ect: Sunrise Road Subdivision <br />Date: March 9, 2000 <br />s 19otBO2.ME,a.oso9oo.x <br />Enclosed is the complete preliminary Plat application for Sunrise Springs; responding m the <br />Concept Plan comments we received upon Concept Plan approval on June 2,1999. <br />Neighbors asked about trees; we have shown the proposed house placement on the lots; which <br />demonstrate how we will save trees. Also, the Clearing limits for the roadway are ey yr Tninirnal_ <br />Neighbors asked about sttmmwater runoff, Our statement at the Concept Plan meeting was that <br />we would use the new roadway ("Street A'~ to intercept sheetflow coming towards the <br />drainageway and redirect that water towards I~0. <br />We have done this on the fu:al plans. <br />The design for Street A takes all sheetflow and ditch water from station 2 + 04.76 back towards <br />I-40. This includes inoercepting some of tlar age off 5umise Road and sending it back to I <br />40. The 25 year flow through the 1$"RCP pipe under Street A is 9.40 cfs, which is less than the <br />pre-development 25-~ flow going to the drainageway. <br />Neighbors asked about the 40 foot septic easement and force main. <br />We have eliminated the septic easement and force main from the pleas entirely, including the <br />associated clearing ltas been eliminated. <br />Neighbors asked about two septic systems on lot 5. <br />We have eliminated one lot and reducxd the subdivision iiom 91ots to 81ots and in the process <br />we will only have o~ (1) septic system on each lot, including lot 5. <br />Neighbors asked about covenants. Covenants will be adopted by this subdivision. Neighbors <br />asked about access of all lots to Street "A". Tits plan shows all houses oriented with drives off <br />Street "A". There will be no 'vewa off Sunrise Road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.