Browse
Search
Agenda - 09-19-2000-9b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 09-19-2000
>
Agenda - 09-19-2000-9b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 4:37:56 AM
Creation date
8/29/2008 11:21:08 AM
Metadata
Fields
Template:
BOCC
Date
9/19/2000
Document Type
Agenda
Agenda Item
9b
Document Relationships
Minutes - 09-19-2000
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
RES-2000-084 Resolution approving The Woodlands (formerly Nine Gates) Preliminary Plan
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />ORANGE CQUNTY PLANNING & Il'~TSPECTIQNS DEPARTI4IENT <br />POST OFFICE BOX Sl$l. 306-F REVERE ROAD <br />HQ+L$BOROi7GH, NORTH CAROLINA 2727$ <br />`~~~V y O <br />Y ~ <br />v n <br />EROSION CONTROL DIVISION <br />Carrbom/Chapel Hill 968501 Durham 6$8-7331 HiIlsbomugh 732-8181 Mebane 227-2031 <br />Telephone 1"sxonsion 2586 FAX 919-644-3002 <br />Memorandum <br />T0: Craig Benedict, Planning Director <br />FROM: Warren Faircloth, Erosion Control Supervisor <br />SII8JECT: Woodlands Subdivision <br />DATL: June 14, 2000 ' <br />On Tuesday afternoon, June 13, 2000, Tina Moon and I met with Lynn <br />Cox to discuss her concerns about the impact of construction and <br />runoff on her property. <br />The main concern is runoff through her two lots. The site plan <br />proposes to discharge runoff from part of the roads and lots into <br />an existing drainageway through Ms. Cox's woods and pasture. The <br />concern is flooding the pasture and causing wet ground. Based on <br />the information in the site plan and our inspection this is an <br />appropriate location to discharge the runoff since it is the <br />natural path for runoff from the existing topography. The plan <br />incorporates measures to limit, the increase in .runoff (large lots, <br />impervious surface limits, and grass channels); however, <br />development will still increase the rate and volume of runoff. It <br />appears that care- and supervision will be necessary during <br />construction to ensure that runoff does follow this natural path <br />due to irregularities in the ground below the point of discharge. <br />Another concesza. is the effect of runoff on the undeveloped lot of <br />Ms. Cox, particularly the septic field. The site and road plans <br />indicates that runoff will be diverted around this lot using the <br />road ditches. Again, care will be required during construction. <br />There are other issues related to construction that are beyond the <br />Department's jurisdiction; such as maintaining access to Ms. Cox's <br />property during construction, ensuring electricity and telephone <br />services are not interrupted by construction, and providing a <br />driveway pipe at the pasture gate. It would be advisable for the <br />developer to initiate contact with Ms. Cox to discuss these issues, <br />particularly the ones that the Department has no jurisdiction over. <br />~ ~ <br />.(~U ~ <br />,y57 6-14.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.