Browse
Search
Agenda - 09-05-2000-9g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 09-05-2000
>
Agenda - 09-05-2000-9g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 5:28:45 AM
Creation date
8/29/2008 11:20:53 AM
Metadata
Fields
Template:
BOCC
Date
9/5/2000
Document Type
Agenda
Agenda Item
9g
Document Relationships
Minutes - 09-05-2000
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
RES-2000-079 Resolution approving Section Two Beaver Valley Preliminary Plat
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br />4 <br />B. Roads and Access <br />1. Beaver Valley Drive,. Heron Hill Road, and Hawk Rest Road shall be constructed <br />to standards of the North Carolina Department of Transportation, within a 50' <br />right-of--way with 5 foot utility easements on each side, and the construction shall <br />be inspected and approved by NCDOT. <br />OR <br />A letter of credit or escrow agreement or other security shall be submitted to <br />secure construction of Beaver Valley Drive, Heron Hill Road; and Hawk Rest <br />Road to the standazds of the North Carolina Department of Transportation. An <br />estimate of the construction cost must be prepazed by a certifed/licensed engineer <br />or grading contractor and submitted to the Planning and Inspections Department. <br />The financial guarantee must reflect 110% of that estimate and be issued by an <br />accredited financial institution licensed to do business in North Carolina. <br />The document describing development restrictions to be recorded with the Final. <br />Flat shall state that the financial guazantee will not be released until the road <br />construction has been inspected and approved by NCDOT. <br />2. All lots shall receive access from the internal subdivision roads. Lots 43 and 55 <br />shall receive access from Heron Hill Road. Lots 56 and 63 shall receive access <br />fram Hawk Rest Road. No driveways shall be permitted within 50' of a street <br />intersection. <br />3. An erosion control plan for construction of the roads shall be submitted by the <br />applicant to the Orange County Erosion Control Division for review and approval. <br />4. Approved street name signs shall be erected at the intersection of streets as <br />required in Section IV-B-3-c-12 of the Orange County Subdivision Regulations. <br />Evidence shall be submitted by the applicant that the sign is in place, or a copy of <br />the receipt for purchase of the sign shall be submitted to the Planning Department. <br />C. Land Use Buffers and Landscaping <br />1. Landscaping shall be installed or preserved as indicated on the approved <br />landscape plan, and must be inspected and approved by the Planning and <br />Inspections Department. <br />2. Provisions for protection of existing trees as shown on the approved landscape <br />plan shall be included in a document describing development restrictions and <br />requirements to be prepared•by Planning Staff and recorded concurrently with the <br />Final Plat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.