Browse
Search
Agenda - 09-05-2000-8p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 09-05-2000
>
Agenda - 09-05-2000-8p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:00:50 PM
Creation date
8/29/2008 11:20:41 AM
Metadata
Fields
Template:
BOCC
Date
9/5/2000
Document Type
Agenda
Agenda Item
8p
Document Relationships
Minutes - 09-05-2000
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
ORD-2000-134 Orange County Soil Erosion and Sedimentation Ordinance Amendments
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Review and Response to Plans <br />The Erosion Control Officer will review each complete plan submitted and within 30 days of receipt <br />thereof will notify the person submitting the plan that it has been approved, approved with modifications, <br />approved with conditions, approved with performance reservations, or disapproved. Examples of <br />conditions of approval are, but not limited to: channel stabili2ation must be successful or another type of <br />lining must be used; delineating certain areas to be graded and stabilized within a specified number of <br />days to reduce the potential for erosion and protect critical areas; providing a performance security to <br />provide permanent ground cover; and requiring the person financially responsible to retain the services <br />of a professional engineer or architect to supervise implementation of the approved erosion control plan. <br />Deadline for Reviewing Plan <br />Failure to approve a rove with conditions a rove with modifications or disapprove a complete <br />erosion and sedimentation control plan within 30 days of receipt of the complete plan shall be deemed <br />approval. Disarmoval l~enael of a plan must specifically state in writing the reasons for disapproval <br />~. The County must approve a rove with conditions a rove with modifications or deFr3t <br />disapprove a revised plan within 15 days of receipt, or it is deemed to be approved. If, following <br />commencement of aland-disturbing activity pursuant to an approved plan, the County determines that <br />the plan is inadequate to meet the requirements of this Ordinance, the County may require <br />any revision of the plan as~re that is necessary to comply with this Ordinance. Failure to approve, <br />a rove with conditions a rove with modifications or disa rove a revised erasion control lan within <br />1 S da s of recei t shall be deemed a royal of the lan. <br />G. Review of Other Environmental Documents <br />Any plan submitted for eland-disturbing activity for which an environmental document (either an <br />assessment or impact statement) is required by the North Carolina Environmental Policy Act (G.S. <br />113A-1, et seq.) shall be deemed incomplete until a complete environmental document is available for <br />review. The County shall promptly notify the person submitting the plan that the 30 day time limit for <br />review of the plan pursuant to Section 18(C) of this Ordinance shall not begin until a complete <br />environmental document is available for review. <br />The a royal of the erosion control lan is conditioned on the a licant's com liance with Federal and <br />State Water uali laws re lations and rules. <br />H. Consideration of Applicants Fast Performance <br />Oran a Coun ma disa rove ~r Erosion Control Plan ~~eve~ upon a finding that an <br />applicant, : or a aren subsidi <br />or other afl_iliate of the applicant:. <br />2. has failed to-pay a civil penalty assessed pursuant to the Act or a local ordinance adopted <br />pursuant to the Act ; b the time the a ent is <br />due. - <br />Commentary: The changes above will be made in this Section to conform to amendments to the <br />Model Ordinance. <br />Section 21 Inspections and Investigations <br />A. Site Inspections <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.