Orange County NC Website
re uired under the Minin Act of 1971 Article 7 of Cha ter 74 of the General statues. <br />Cammentary: The changes above will be made in this Section to conform to amendments to the <br />Model Qrdinance. <br />Section 1T Permits <br />C. 6~a~g Land- Disturbine Fen!nit <br />Before starting gland- disturbing activity greater than 20,000 square feet, the owner or his agent shall <br />obtain a i~g Land- Disturbin Permit from the Erosion Control Officer. Erosion Control Plans must <br />be approved before a ~adi~g Land- Disturbing Permit will be issued. ~ Land- Disturbin Permits <br />may be obtained when the Plan is approved or prior to the start of the land disturbance. <br />Commentary: This text change will occur throughout the Ordinance. The purpose of this change is to <br />clam that the Permit is to be obtained before am, land-disturbing activity. <br />D. Expiration of Permits <br />Flan Approvals <br />The Coun ma establish an ex iration date for erosion control lans a roved under this Ordinance. <br />Erosion Control Plan Approvals expire ei hteen months eaewyaa~ after the approval date unless the land <br />disturbance is started as defined below. <br />Commentary; The text wild be added to conform to the Model. Sta,,~`is proposing that the time <br />period of expiration be extended to give reasonable time for applicant to obtain ald approvals <br />and permits necessary to construct the project, which can take considerable time in Carrboro <br />and Chapel Hill. - <br />Section 18 Erosion and Sedimentation Control Plans <br />A. Plan Requirement <br />An Erosion Control Plan shall be prepared for all land-disturbing activities subject to this Ordinance <br />whenever the proposed activity is to be undertaken on a tract comprising more than 20,000 square feet, if <br />more than 20,000 square feet are to be uncovered. Three (3) copies of the Plan shall be filed with the <br />Erosion Control Officer, one~c___~y of which will be sinnultaneously forwarded to the Orange Soil and <br />Water Conservation District, at least 30 days prior to the commencement of the proposed activity. <br />One co of the Plan must be forwarded to the Director of the NC Division of Water uali for an <br />land-disturb' activi that involves the utilization of ditches for the u ose of de-waterin or lowerin <br />the water tabs, <br />._.-r.~ <br />B. Review by the Soil & Water Conservation District <br />The Orange Soil and Water Conservation District, ' <br />,shall review <br />such plan and submit its ~ comments and recommendations to the Erosion Control Officer within 20 <br />da s after the Soil and Water Conservation District received the erosion control lan or within an <br />shorter eriod of time as ma be a eed u on b the District and the Coun .Failure of the District to <br />submit its comments and recommendations to the Erosion Control Officer within ~e-~esar~e~ 20 da,~ <br />or an a reed-u on shorter eriod of time ~•1 shall not delay final action on the plan. <br />2 <br />