Browse
Search
Agenda - 09-05-2000-8l
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 09-05-2000
>
Agenda - 09-05-2000-8l
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:01:43 PM
Creation date
8/29/2008 11:20:38 AM
Metadata
Fields
Template:
BOCC
Date
9/5/2000
Document Type
Agenda
Agenda Item
8l
Document Relationships
2000 S Solid Waste - Approval of Food Waste Collection and Composting Contract with Brooks Contracting (2)
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2000
Minutes - 09-05-2000
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
either by sending the collection vehicle back, or by sending someone with a smaller vehicle to <br />collect the materials. <br />If Contractor cannot provide service on the scheduled day, Contractor will report non-collection <br />to County on the day that service is scheduled to be provided. County prefers to be notified at the <br />time that the inaccessibility is discovered. Knowledge of inaccessibility is important to County <br />and is useful when dealing with the residents of these azeas as they call to report missed <br />collections. if Contractor cannot notify County at the time that inaccessibility is discovered, <br />Contractor must notify County (either by telephone, fax, or in person) before 4:30 PM of that <br />day, if Contractor fails to notify County of azeas that aze not able to be collected due to <br />inaccessibility by 4:30 PM of the day the azea is scheduled to be serviced, County may levy <br />penalties equal to $25 per household not collected. Any resultant penalties may be deducted <br />from the cast of service for the month in which the failure to notify took place. <br />When County receives a report of a missed collection from a resident of an azea that was not <br />serviced due to inaccessibility, County will instruct the resident to leave their recyclable <br />materials at the curbside and to expect collection either later during their scheduled service day <br />or no later than 5:00 PM of the next working day (assuming that the roadway is no longer <br />inaccessible). <br />Contractor will provide collection of an area not serviced due to inaccessibility by 5:00 PM of the. <br />next working day. In the case of ongoing construction or blockage, recycling collection may. be <br />cancelled, and in this case residents will be notified by County that curbside recycling must be <br />suspended until construction is complete or the cause of the inaccessibility is removed. <br />SECTION 14 <br />Processing Center <br />Contractor may maintain a Processing Center at its facilities located in the City of Durham, the City <br />of Raleigh or at other locations. All Recyclable Materials collected from residents may be <br />processed at the Processing Center. Title to Recyclable Materials brought to the Processing Center <br />shall be with Contractor and they shall have the responsibility for the sale of such Recyclable <br />Materials. Storage of Recyclable Materials at the Processing Center shall be limited to that which <br />can be properly contemned pursuant to permits issued by the responsible jurisdiction. Contractor <br />shall notify County Representatives, in writing, not less than thirty (30) days prior to any relocation <br />of the Processing ar Drop-Off Center. <br />If County elects to build its own recycling processing center during the term of this contract, or to <br />divert the_ materials collected under this contract to any other existing facility, the materials <br />collected in this program may be directed to that processing center and become property of County <br />at County's discretion. Any changes in net revenue to the Contractor as a result of this change in <br />destination and ownership of recyclable materials, or as a result of the need for the Contractor to <br />make equipment modifications, shall be negotiated between the Contractor and County. <br />
The URL can be used to link to this page
Your browser does not support the video tag.