Browse
Search
Agenda - 09-05-2000-8l
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 09-05-2000
>
Agenda - 09-05-2000-8l
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:01:43 PM
Creation date
8/29/2008 11:20:38 AM
Metadata
Fields
Template:
BOCC
Date
9/5/2000
Document Type
Agenda
Agenda Item
8l
Document Relationships
2000 S Solid Waste - Approval of Food Waste Collection and Composting Contract with Brooks Contracting (2)
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2000
Minutes - 09-05-2000
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of specific repairs or improvements will be negotiated with County. Contractor's portion of the <br />costs will not exceed $3,000.00 per fiscal year (regardless of the number of contracts between <br />County and Contractor), and may be paid by reductions in monthly invoices from this contract. <br />SECTION 11 <br />Labor and Costs <br />Contractor shall, at its sole cost and expense, except as otherwise provided herein, furnish all labor <br />and equipment required to perform curbside collection of Recyclable Materials pursuant to this <br />Agreement. <br />SECTION 12 <br />Penalties For Missed Pick-Ups of Materials Collected in this Program <br />Incase of a missed pick-up reported by County or a resident (late set-outs excluded), Contractor <br />shall collect the Recyclable Materials from such point by 5:00 PM of the working day following <br />written or faxed notification of said missed pick up if point was accessible and not blocked. All <br />calls relating to missed pick-ups or other collection problems shall be logged by County recycling <br />staff and will be available for review by Contractor. <br />If containers which were recorded by County as riot collected by Contractor are not collected by <br />5:00 PM of the working day (including Monday through Friday, but not Saturdays, Sundays; or <br />designated holidays) following written or faxed notification of Contractor by County, County may <br />levy penalties equal to $25 per household per day not collected. To avoid the penalty, Contractor <br />must provide legitimate explanation for non-collection before 5:00 PM of the day following the <br />non-collection report if the container was unable to be collected for a certain reason. <br />If County receives a report of five (5) or more missed collections in one area on a working day that <br />is followed by anon-working day, Contractor will provide collection by 5:00 PM the following <br />day, excluding holidays. Far example if County receives notification of 5 or more missed <br />collections on one street, or in one neighborhood at 4:30 PM on a Friday and notifies Contractor of <br />the reported misses by close of business an that Friday, Contractor will provide collection by 5:00 <br />PM on Saturday (assuming that Saturday is not a recognized holiday). <br />SECTION 13 <br />Refusal to Pick Ua <br />Contractor may choose not to pick up if Recyclable Materials are contaminated or improperly <br />prepared (i.e., yogurt containers, newspapers to plastic bags, plastic bottles with lids). When and if <br />Recyclable Materials are not collected, a notice must be left accurately describing why the bin <br />contents were not collected. The form of said notice must be pre-approved by County. This notice <br />must contain instructions describing how to properly prepare materials for recycling and how to <br />contact County for further information about recycling programs. <br />In a' situation where a street is inaccessible to the Contractor's collection vehicle due to a parked <br />vehicle, utility work, construction work, or any other obstruction rendering a roadway <br />completely or partially blocked, Contractor may attempt to service said street later that same day, <br />
The URL can be used to link to this page
Your browser does not support the video tag.