Browse
Search
Agenda - 09-05-2000-8l
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 09-05-2000
>
Agenda - 09-05-2000-8l
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:01:43 PM
Creation date
8/29/2008 11:20:38 AM
Metadata
Fields
Template:
BOCC
Date
9/5/2000
Document Type
Agenda
Agenda Item
8l
Document Relationships
2000 S Solid Waste - Approval of Food Waste Collection and Composting Contract with Brooks Contracting (2)
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2000
Minutes - 09-05-2000
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />recycling services County may negotiate with Contractor and receive a reduction in cast of services <br />for services which were not rendered. In general, if services are temporarily canceled at County's <br />request, County will pay in full for services which aze not performed, and in such case County may <br />request that Contractor provide said services on a make-up day at no further cost to County. If <br />Contractor is unable to provide service due to severe weather or other event, County may negotiate <br />with Contractor and receive reduction in the cost of services, to be deducted from the bill for the <br />period during which services were not provided, or from a bill for any service period following that <br />service period. Any reduction in the costs of services shall be based upon the pro-rata share of <br />services not rendered minus Contractor's verifiable overhead expenses plus any verifiable increased <br />expenses (i.e. overtime costs incurred by Contractor due to excessive amounts of recyclables <br />having been held over during period of cancellation). <br />SECTION 17 <br />Protection of Re clable Materials <br />County agrees to take such steps as may be reasonably necessary to protect Contractor's ownership <br />of all Recyclable Materials placed at the recycling containers for collection by Contractor under the <br />terms of this Agreement and shall consider adopting anti-scavenging ordinances, if necessary, to <br />provide such protection. <br />SECTION 18 <br />Permits and Licenses <br />Contractor, at its sole cost and expense, shall maintain throughout the term of this Agreement all <br />permits, licenses and approvals necessary or required for Contractor to perform the work and <br />services described herein, including but not limited to the collection of Recyclable Materials and <br />operation of the Processing Center. <br />SECTION 19 <br />Independent Contractor <br />Contractor shall perform all work and services described herein as an independent contractor and <br />not as an officer, agent, servant or employee of County. Contractor shall have exclusive control of <br />and the exclusive right to control the details of the services and work performed hereunder and all <br />persons performing the same and nothing herein shall be constructed as creating a partnership or <br />joint venture between County and Contractor. No person performing any of the work or services <br />described hereunder shall be considered an officer, agent, servant or employee of County, and no <br />such person shall be entitled to any benefits available or granted to employees of County. <br />SECTION 20 <br />Non-Assignment <br />Neither Contractor nor County shall assign, transfer, convey, or otherwise hypothecate this <br />Agreement or their rights, duties or obligations hereunder or any part thereof without the prior <br />written consent of the other. <br />~n <br />
The URL can be used to link to this page
Your browser does not support the video tag.