Browse
Search
Agenda - 08-15-2000-9b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 08-15-2000
>
Agenda - 08-15-2000-9b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 12:27:14 PM
Creation date
8/29/2008 11:20:04 AM
Metadata
Fields
Template:
BOCC
Date
8/15/2000
Document Type
Agenda
Agenda Item
9b
Document Relationships
Minutes - 08-15-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />NCSU provided some pro bono design work through both himself and his students and NCSU. <br />However, the project exceeded his available resources and he is unable to proceed. It is our <br />understanding that Paton - Zachino provided some support services to Mr. Wilkerson during the <br />pro bono phase and is familiar with the project. <br />FINANCIAL IMPACT: <br />The estimated total cost of the project, including the right -of -way, is $69,950 (Item 1 shown in <br />the table below). Available County funding for the park design and construction includes <br />savings from the Skills Development Center Purchase and Renovation Capital Project along <br />with an appropriation from the County Capital Fund Surplus (see Item 2 below). Available Town <br />of Chapel Hill funding for right -of -way improvements totals $60,000 (see Item 3 below), <br />1. Estimated Cost of Pocket Park <br />Estimated Park Construction Cost $50,000 <br />Park Design Fee (including estimated reimbursables) $8,000 <br />Estimated Right -of Way Improvements Cost $15,000 <br />Total Cost of Pocket Park (including right -of -way <br />2. County Funds Available for Project <br />Funds Remaining in Skills Development Center Capital Project $40,000 <br />Appropriation from County Capital Fund Surplus $18,000 <br />Total County Funds Available for Project $58,000 <br />3. Town of Chapel Hill's Total Available Funds for Right -of -Way <br />Improvments $60,000 <br />RECOMMENDATION(S): The Manager recommends: <br />• Approve the construction of the pocket park; and <br />• Authorize County staff to coordinate with the Town of Chapel Hill to extent needed to ensure <br />design and construction requirements are met for the promised funding; and <br />• Authorize the Manager to contract with the design firm of Paton - Zachino in an amount not to <br />exceed $4,900 plus whatever reimbursable expenses may be needed to produce the <br />construction documents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.