Browse
Search
Agenda - 08-15-2000-8n
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 08-15-2000
>
Agenda - 08-15-2000-8n
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:38:14 PM
Creation date
8/29/2008 11:20:01 AM
Metadata
Fields
Template:
BOCC
Date
8/15/2000
Document Type
Agenda
Agenda Item
8n
Document Relationships
2000 S Solid Waste - N.C. Department of Environment and Natural Resources 2000 Solid Waste Reduction Assistance Grant Project
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2000
2000 S Solid Waste - N.C. Department of Environment and Natural Resources 2000 Solid Waste Reduction Assistance Grant Project H01012
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2000
Minutes - 08-15-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACT NO. H01012 6 <br />17. The CONTRACTOR shall ensure that all publications produced as a <br />result of this contract are printed double-sided on recycled paper. <br />18. The filing of a petition in bankruptcy or insolvency by or against the <br />CONTRACTOR shall terminate this agreement. <br />19. The CONTRACTOR shall not assign or transfer any interest in this <br />agreement. <br />20. No reports, maps or other documents produced in whole or in part under <br />this agreemen# shall be the subject of an application for copyright by or on behalf of the <br />CONTRACTOR. <br />21. It is agreed. between the parties hereto that the place of this contract, its <br />situs and forum, shall be Wake County, North Carolina, and in said County and State shall all <br />matters, whether sounding in contract or tort relating to the validity, construction, interpretation <br />and enforcement of this agreement, be determined. <br />22. The CONTRACTOR agrees that the State may have the right to audit the <br />records of the CONTRACTOR pertaining to this contract both during performance and for 36 <br />months after completion or termination. The CONTRACTOR must retain all records relating to <br />this contract and allow employees or agents of the DEPARTMENT to inspect such records <br />during the period of time set out herein. <br />23. The CONTRACTOR agrees that he shall be responsible for the proper <br />custody and care of any State owned property furnished him for use in connection with the <br />performance of his contract and will reimburse the State for its loss or damage. <br />24. The CONTRACTOR certifies that he is in compliance with "Attachment I" <br />Assurances-Nan Construction Programs. <br />25. Scott Mouw is designated as the Contract Administrator (project <br />coordinator) for the State. However, any changes in the scope of the contract which will <br />increase or decrease the CONTRACTOR'S compensation shall. not be effective until they have <br />been approved by the DEPARTMENT Head or Authorized Agent. <br />dnf~i <br />
The URL can be used to link to this page
Your browser does not support the video tag.