Browse
Search
Agenda - 08-15-2000-8m
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 08-15-2000
>
Agenda - 08-15-2000-8m
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:39:06 PM
Creation date
8/29/2008 11:19:59 AM
Metadata
Fields
Template:
BOCC
Date
8/15/2000
Document Type
Agenda
Agenda Item
8m
Document Relationships
Minutes - 08-15-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
ORD-2000-129 Orange County Neuse River Basin Stormwater Management Ordinance
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br />Figure 3a: Field Screening Process <br />Screen outfall in high priority area No Check for signs of intermittent fl <br />flow <br />Flow found ~ Flow found I No flow <br />Inspect and sample flow <br />Investigate source of flow, <br />considering <br />the following: <br />• Jurisdiction-wide information <br />collected <br />• Field investigation of drainage <br />area of <br />outfall <br />Remove illegal discharge <br />Outfall OK <br />'" Checking for intermittent flow includes rechecking outfall at a later date as well as <br />visual observations far evidence of intermittent flow. <br />Note: Analytical monitoring is required only if an obvious source of the dry weather <br />flow cannot be determined through an investigation of the upstream stormwater <br />collection system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.