Browse
Search
Agenda - 08-15-2000-8j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 08-15-2000
>
Agenda - 08-15-2000-8j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:40:01 PM
Creation date
8/29/2008 11:19:57 AM
Metadata
Fields
Template:
BOCC
Date
8/15/2000
Document Type
Agenda
Agenda Item
8j
Document Relationships
Minutes - 08-15-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
RES-2000-069 Resolution approving Sunrise Springs Subdivision Preliminary Plat
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 <br />Kirk pointed out that the Concept Plan had nine lots and the Preliminary Plan has eight lots. The <br />ninth lot has been combinedwith an existing lot. There aze now no easements for septic <br />systems. <br />5 Preston said that she was pleased to see landscaping information about the buffers. She is <br />6 concerned that some of the plants that are along Sunrise Road aze going to suffer and probably <br />7 die. She wished it had been a mixed planting and not just the cypresses. She was also surprised <br />8 that the landscaping was already done when the Planning Boazd had not yet approved the plan. <br />9 She is also concerned about the storm drainage easement that goes all the way through the site, <br />1 o under the road, and through lot seven. She asked what it .would actually do to lot seven. <br />11 <br />12 Ernie Dodson, who works with Phil Post, said that there was only a pipe underneath the right-of <br />13 way under the road. The easement across lot seven follows the natural drainage area through the <br />14 lot. The house on lot seven is located near the setback line in order to take advantage of suitable <br />15 soils for agravity-feed septic system. <br />lb <br />17 Barrows asked for clarification on Preston's concerns about the planting. <br />is <br />19 Preston made reference to the agenda abstract and said that maples and water aaks were not <br />20 suitable to go underneath power lines. She said that the planting should not be up on a berm. <br />21 <br />22 Benedict said that the applicant had no approval to do the planting before the Planning Board and <br />23 the County Commissioners approved the subdivision. He said that the applicant had no vested <br />24 rights of continuing the plan until it was approved. He said that the board could suggest mixed <br />zS planting schemes without berms, and this could be one of the conditions far approval of the <br />26 project. <br />27 <br />2s MOTION: Preston moved to accept the staffs recommendation to approve the <br />29 Preluninary Plan for Sunrise Springs with the change that the type <br />3U A buffer along Sunrise Road is to be reconstructed to be mixed <br />31 planting of small, deciduous trees and small evergreen trees, not on <br />3z a berm. Seconded by Katz. <br />33 <br />34 Strayhorn agrees with the composition of the plants, but he thinks that the berms should stay <br />3s because they provide privacy. Preston explained haw berms could cause the trees to die. <br />36 <br />37 Ernie Dodson said that the intent of the berms was for noise control because of how close the <br />38 subdivision is to ISO. He asked if the berms could stay and the cypresses could just be <br />39 interspersed with other trees. <br />40 <br />41 Katz asked about the responsibility of the developer in maintaining the buffer in the future. <br />42 <br />43 Ernie Dodson said that the warranty period was generally one yeaz. <br />44 <br />45 Katz is opposed to the berm because the plants would die. <br />46 <br />47 Goodwin said that he thinks it is micromanaging to say that berms can or cannot be in a <br />48 development. <br />49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.