Browse
Search
Agenda - 08-15-2000-8j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 08-15-2000
>
Agenda - 08-15-2000-8j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:40:01 PM
Creation date
8/29/2008 11:19:57 AM
Metadata
Fields
Template:
BOCC
Date
8/15/2000
Document Type
Agenda
Agenda Item
8j
Document Relationships
Minutes - 08-15-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
RES-2000-069 Resolution approving Sunrise Springs Subdivision Preliminary Plat
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br />Q.w STA7F °~ <br />r <br />~. <br />i• ~ <br />~~arr+d~ <br />STATE of NORTH CAROLINA <br />DEPARTMENT OF TRANSPORTATION <br />JAMES B. HUNT JR. <br />GOVERNOR <br />15 May 2000 <br />ORANGE COUNTY <br />Philip N. Post <br />Philip Post & Associates <br />401 Providence Road <br />Chapel Hill, NC 27514 <br />919 493-2fi00 <br />SUBJECT: Final Plan Approval: Sunrise Spring Subdivision located off Sunrise Road <br />near Sunrise Road (SR 1732) <br />Dear Mr. Post: <br />DAVID McCOY <br />SECRETARY <br />This office has completed its review of the subject's proposed final plans for compliance with current Department of <br />Transportation minimum subdivision construction standards. We wish to advise that the final plans received at this <br />office are hereby approved. Pursuant to this approval, this office will require you to make the owner/developer <br />aware of the following requirements before starting any construction. <br />I . Prior to any construction of any new access or alteration of any existing access within the right of way, the <br />developer/owner is required to secure a permit with this office. It is the responsibility of the owner/developer <br />to obtain a permit. <br />?. During the construction, it is the responsibility of the owner/developer to provide verification certifying that the <br />roadway surface, drainage, and seeding satisfies the approved design outside the State's right of way. <br />~- <br />3. When working within the State's right of way, the owner/developer will contact the Graham District Office <br />before each of the following phases: (A) Drainage, (B) Grading, (C) Placement of base. (D) Paving, and (E) <br />Seeding. Faiiure to notify this office before each phase of construction may justify verification certified and <br />signed by a professional engineer. <br />4. In accordance with the General Statute i36-102.2, new roads are not eligible for the State Maintenance system <br />unless certain requirements are met. An explanatioh of these requirements can be found on pages 13, l~l. and <br />I S of the current (January 2000) NCDOT Subdivision Roads Manual. Particular attention should be placed on <br />items ? (petition for addition), S, 6, and 7 (occupied housing requirement), (0, t I, 12, and 13. <br />P, O. BOX 766 GRAHAM, NC 27253 PH# 336-570-6833, FAX# 336-570-6873 <br />
The URL can be used to link to this page
Your browser does not support the video tag.