Orange County NC Website
<br />construction of Jomali Drive and Avon Brook Lane to the standards of the North <br />Carolina Department of Transportation. An estimate of the construction cost <br />must be prepared by a certified/licensed engineer or grading contractor and <br />submitted to the Planning and Inspections Department. The financial guazantee <br />must reflect 110 % of that estimate and be issued by an accredited financial <br />institution licensed to do business in North Cazolina. <br />The document describing development restrictions to be recorded with the Final <br />Plat shall state that the financial guarantee will not be released until the road <br />construction has been inspected and approved by NCDOT. <br />2. All lots shall receive access from the internal subdivision roads. No driveways <br />shall be permitted within 50~ of a street intersection. <br />3. An erosion control plan for construction of the roads shall be submitted by the <br />applicant to the Orange County Erosion Control Division for review and <br />approval. <br />4. Approved street name signs shall be erected at the intersection as required in <br />Section 1V-B-3~-12 of the Orange County Subdivision Regulations. Evidence <br />shall be submitted by the applicant that the sign is in place or a copy of the <br />receipt far purchase of the signs shall be submitted to the Planning Department. <br />5. Prior to any construction or alteration of any existing access within the right-af- <br />way of Jomali Drive, the developer/owner shall secure a driveway permit from <br />the NCDOT District Office. Submit a copy of the NCDOT- approved permit <br />and letter to the Planning Department at the same time as the request for <br />Planning Department signatures on the Final Plat. <br />6. Sight triangles (lOr x 70~~ shall be shown on the Final Plat at each intersection. <br />7. Lot 20 shall receive access from Avon Brook Lane. <br />C. Land Use Buffers and Landscaping <br />1. Landscaping shall be installed or preserved as indicated on the approved <br />landscape plan, and must be inspected and approved by the Planning and <br />Inspections Department. Landscaping shall be placed behind the sight triangles <br />at intersections. <br />OR <br />Guaranteed financially through a letter of credit, escrow agreement, ar bond <br />submitted to secure required landscape installation and preservation. An <br />estimate of the cost for required preservation, plantings and their installation <br />must be provided. The financial guarantee shall reflect 110 percent of the <br />estimate and be issued by an accredited financial institution licensed to do <br />business in North Cazolina. <br />