Browse
Search
Agenda - 06-29-2000-9f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 06-29-2000
>
Agenda - 06-29-2000-9f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:44:50 PM
Creation date
8/29/2008 11:19:42 AM
Metadata
Fields
Template:
BOCC
Date
6/29/2000
Document Type
Agenda
Agenda Item
9f
Document Relationships
Minutes - 06-29-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
RES-2000-059 Resolution approving Richmond Hills Preliminary Plat and Sewer System Design
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sl?~'T JUN .21.2000 12 ~ 55PM ORANGE CTY MGR ' u~- 'u ' """""' " <br />^~~ Kimley~Harn <br />~ and Associates, Inc. <br />~uac 20, 2000 <br />Orange C'.awiiy Commissioners <br />1'A. Box S t 81 <br />200 S. L'ameroa Stre~l <br />Hillsbaraugh, NC 27278 <br />Rc: Habitat For 7),umanity Orange Counry, NC, lao. <br />Sanitary sewer system Optioas <br />17ear Chairman Carry and Osage Cotrvt3- <br />Ott behalf ofHabitat for Htuts~.ity, Orange County, NC, . X am happy to prp- <br />vidcd some additional information about sanitary sewer se 'CC a~ioas Lor lhr, <br />Richmond Road Subdivision. <br />~'ollowin~ ~ r~ 6.2000 meetingewe had a u~liug gaol "1"hames and <br />'!'nm Koeslcr to revievr- t~ ope'ationol, rnaiutca~ticn, avid Ilatihn oasts of <br />two sysocros. Theme are descnbcd briefly below. <br />A. Flow Il Station <br />This syspcm,prnvides far a pturip sntien thal. is served y a gravity #low coi <br />lectiaa sysbcm from all homes is il'~ pn+pw.x:+l subcli ' 'an. The ptwnp statioai <br />will be located 1n the southaastem p~tian aftlu Site, pprwtimaccly a20 <br />linear feet a~f farrce main will cCaurdcr the pump station >4 an existing maphote <br />an the F.flat,~d-Cbeekg Elcm~ealary 5chanl Site. <br />a. STEP <br />Main <br />'Tb~s b'Ys~m provides for a saplie tack for each hoau i case of pe-rnp reilurv, <br />a pump 5~ each hnrnc, and three maw far the entire o lleatian system l~acl» <br />ing 1a the manhole at !"itland~Ghccks Elementary Sch 1, <br />Issues to be Cnns..ia.S~lectiria a System <br />Each of tip system has sonu baaclr"its and sonic drawba~c . Dis4u.Yaac! Aux: aumoe <br />c1'those that we feel are mast im~partat<zt f~the F,i,cbm,ond 'lla 5ubdiwision. <br />1) '11,c initial cost of System A is higher due to the recd or ttw pomp starirm in <br />phase 1 of devdoprnettt, bat the total cost is lower by ra~imatcly 12°l0. <br />^ <br />Td ate 7r 2aao <br />roc aia err zaso <br />N0.555 P.2i5 <br />44 <br />ro. sn~~oeo <br />Aalf+iph, Nara Carallrtfa <br />~1899~98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.