Browse
Search
Agenda - 06-29-2000-9e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 06-29-2000
>
Agenda - 06-29-2000-9e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:46:23 PM
Creation date
8/29/2008 11:19:39 AM
Metadata
Fields
Template:
BOCC
Date
6/29/2000
Document Type
Agenda
Agenda Item
9e
Document Relationships
Minutes - 06-29-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
RES-2000-058 Resolution approving Bricewood Acres Subdivision Preliminary Plat
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2000
S Conservation Easement Joseph Phelps
(Linked From)
Path:
\Board of County Commissioners\Various Documents\2000 - 2009\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Roads and Access <br />1. Dustin Drive and McCray Lane shall be constructed to standards of the North <br />Cazolina Department of Transportation, within a 50' right-of--way, and the <br />construction shall be inspected and approved by NCDOT. <br />OR <br />A letter of credit or escrow agreement or other security shall be submitted to <br />secure construction of Dustin Drive, and McCray Lane to the standards of the <br />North Cazolina Department of Transportation. An estimate of the construction <br />cost must be prepazed by a certified/licensed engineer or grading contractor and <br />submitted to the Planning and Inspections Department. The financial guazantee <br />must reflect 110% of that estimate and be issued by an accredited financial <br />institution licensed to do business in North Cazolina. <br />The document describing development restrictions to be recorded with the Final <br />Plat shall state that the f nancial guazantee will not be released until the road <br />construction has been inspected and approved by NCDOT. <br />2. An erosion control plan for construction of the roads shall be submitted by the <br />applicant to the Orange County Erosion Control Division far review and approval. <br />3. Approved street name signs shall be erected at the intersection of streets as <br />required in Section IV-B-3-c-12 of the Orange County Subdivision Regulations. <br />Evidence shall be submitted by the applicant that the sign is in place, or a copy of <br />the receipt for purchase of the sign shall be submitted to the Planning Department. <br />4. All lots shall access onto the new subdivision roads. No driveways shall be <br />permitted within 50' of a street intersection. <br />5. A 50 foot public right-of-way designated as tract C shall be provided to the <br />southern property line with 20' temporary construction easements as indicated on <br />the Preliminary Plan. <br />6. All streets shall have 5 foot utility easements on each side of the right-of--way. <br />7. The applicant shall request the posted speed limit on Gov. Scott Road to be <br />lowered to X15-mph as recommended by NCDOT prior to Planning Department <br />signatures on the final plat. <br />C. Land Use Buffers and Landscaping <br />1. Landscaping shall be installed or preserved as indicated on the approved <br />landscape plan, and must be inspected and approved by the Planning and <br />Inspections Department. <br />
The URL can be used to link to this page
Your browser does not support the video tag.