Browse
Search
Agenda - 06-29-2000-8w
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 06-29-2000
>
Agenda - 06-29-2000-8w
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:48:31 PM
Creation date
8/29/2008 11:19:32 AM
Metadata
Fields
Template:
BOCC
Date
6/29/2000
Document Type
Agenda
Agenda Item
8w
Document Relationships
2000 S Purchasing - RFP Award of Professional Services for Design of the Whitted and Northern HVAC Systems and the Electrical System Renovation at Court Street
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2000
Minutes - 06-29-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br />ROBSON do WOESE INC. <br />Mr. Dwld tc. CannW <br />Jung 1x, 2000 <br />Page 3 <br />RFP/ 5007 t:lwctriad 3 Mechanlal Englnertrirp servkes <br />cQUnty of ornp. <br />Itaw iVo. ~ <br />Design Services for t~le~LiVAG 5~tem <br />SchematicJDD Submission Week 13 <br />Revisions Week 16 <br />CD Submission Week 22 <br />CD Review Week 28 <br />Review Comedions and Advertisement for Bids Week 28 <br />Bidding Week 32 <br />Award of Contrail and Notice to Bidders Week 3B <br />Construilion Week 88 <br />Closing week 72 <br />FEE FOR SERVICES <br />Our fee fir the scope of services wiN be a lump sum fee of 7rMO FIurl~sd Six>~I-Nine 7lrousand 7'Mro <br />Hundred Seventy Dollars (i~,Z70.oo1. <br />We recarnrnend that one feasibility study be done for the Richard W. Whiffed human Resource Building. <br />and use this study as a model for the other buildings. h you desire a feasibility study for The Northam <br />Center as well, as noted in the RFP, please add an additional lump sum fee of Seven Thousand Dollars <br />(~T.000.00) to the fee Ysted above. <br />Our understanding is that tyre Richard E V1Rrtited Firxrran Re~sOwce Bur~rg is being renovated <br />continuously without "as-butt' drawings. The fee quoted above does not indude Held measurements for <br />creating 'as-butt' aondifions. AppriaramatelY ephly (8~ man•hours will bs required to develop 'as-hula" <br />partitions Of the buildings. rr you prefer us t0 develop "as-bu18' conditlorrs, the add8ional cross will be <br />64,000.00. <br />The Fees viii be payable ~ follows: <br />Feasibility Study (Tor Richard E. tMnitt•d Banding onWy): <br />• 612,320 at Draft Subrnissiorl (estimated total fee for the study is x15,400.00) <br />• 63,080.00 at Final Subm~ion of the report. <br />(If The Northam is irliladed in the study. the fees wiN be adjusted at fire same proportion as <br />Rldrard E 1Mrllfsd 8uidirg.) <br />Design Phase: <br />35% of the total fee at Shcemign Development Submission <br />2096 of the total fee at 5096 Bid DOarrrrerrt Phase <br />2596 ~ the total fee at 100% ~d Ooatrnerrt Phase <br />1596 of the total fee at 5096 Consavcdon Adrrninistration Phase <br />5% of the total fee at Closing <br />
The URL can be used to link to this page
Your browser does not support the video tag.